I was informed by a Mr Mann, the project's chief engineer, that the cost
differential between bored 4.6m tunnels and bored 6m tunnels was negligible.
This is in an area of saturated dune sands, clays and silts with little
sedimetary rock and no hard rock - so tunnel lining performance parameters
Cue Bruce on how you must also be a profoundly ignorant ****wit as this
clearly is impossible. Obviously an extra 1.4m would raise the price so high
no one in their right mind could state the cost difference was negligable?