EU lending for Crossrail
Robert wrote:
But the volume of material being excavated /does/ increase as the
square of the diameter. If the tunnel diameter is increased from 6.5
metres to 7.5 metres, a 15 per cent increase, the volume of spoil
increases by 33 per cent. (All numbers rounded).
It's actually more, because, as mentioned elsewhere, the tunnel lining gets
thicker as well.
|