ELL coming sooner not later
On Jan 24, 11:19*am, Andy wrote:
On Jan 20, 9:28*am, "Paul Scott" wrote: wrote in message ... On 19.01.10 22:38, Paul Scott wrote: "Paul *wrote in message . .. One thing I would like to understand is whether it will be possible for TfL to run any sort of "ghost" timetable south of New Cross Gate on NR metals prior to 23/5/10? * Given that a major recast of Southern services is required there must be a risk that LOROL "debug" the new bit north of New Cross Gate but then find it a struggle to get to grips with the service carrying on to Crystal Palace and West Croydon. News just in Paul. A supplementary track access has been agreed, allowing for 15 slots per day in each direction from 17th Jan until the timetable change date: http://www.rail-reg.gov.uk/upload/pd...ion-letter.pdf I read elsewhere that the signalled connections to NR were meant to come into full time use last weekend, but the up connection signals at least were bagged over today . Still, should see some 378s out and about through Sydenham pretty soon now... I would imagine that there are plenty to go around if building work is finished and approved ahead of schedule? The 378s? Somewhat behind schedule I think, although there are plenty of the ELL variety available now. 10 or more units sitting at NXG depot as of yesterday. *But 378/0s for the NLL/DC lines seem to have ceased being delivered for the moment. The deliveries of the 378/1s for the ELL are pretty much on schedule (I think units 136-152 have already arrived, just leaving 132-135 and 153 still to come). The rate of deliveries of the 378/0s may have slowed down, but there have been at least two arriving at Willesden this month (006 and 003). plus 154 still to arrive from the 378/1s, just realised that I'd missed it. |
ELL coming sooner not later
"Andy" wrote
Andy wrote: "Paul Scott" wrte The 378s? Somewhat behind schedule I think, although there are plenty of the ELL variety available now. 10 or more units sitting at NXG depot as of yesterday. But 378/0s for the NLL/DC lines seem to have ceased being delivered for the moment. The deliveries of the 378/1s for the ELL are pretty much on schedule (I think units 136-152 have already arrived, just leaving 132-135 and 153 still to come). The rate of deliveries of the 378/0s may have slowed down, but there have been at least two arriving at Willesden this month (006 and 003). plus 154 still to arrive from the 378/1s, just realised that I'd missed it. That doesn't quite agree with what Platform 5 say the batches are. They (in their new 2010 book) have: 378001-024 (to become 201-224): 3-car (to become 4-car) AC/DC units. 378225-234 4-car AC/DC units, + possibly the three extra units 378255-257. 378135-154 4-car DC units. |
ELL coming sooner not later
On Jan 24, 12:58*pm, "John Salmon" wrote:
"Andy" wrote Andy wrote: "Paul Scott" wrte The 378s? Somewhat behind schedule I think, although there are plenty of the ELL variety available now. 10 or more units sitting at NXG depot as of yesterday. But 378/0s for the NLL/DC lines seem to have ceased being delivered for the moment. The deliveries of the 378/1s for the ELL are pretty much on schedule (I think units 136-152 have already arrived, just leaving 132-135 and 153 still to come). The rate of deliveries of the 378/0s may have slowed down, but there have been at least two arriving at Willesden this month (006 and 003). plus 154 still to arrive from the 378/1s, just realised that I'd missed it. That doesn't quite agree with what Platform 5 say the batches are. *They (in their new 2010 book) have: 378001-024 (to become 201-224): 3-car (to become 4-car) AC/DC units. 378225-234 4-car AC/DC units, + possibly the three extra units 378255-257.. 378135-154 4-car DC units. Gahhh, the joys of being interrupted when posting!! I was busy changing the typo of 132 to 135 (and adding 154) but must have come back and put a - in instead of deleting and missed the 154. So it should have read: just units 135 and 153-154 still to come (from the ELL units) and so the 378/1s are nearly complete and on schedule. Deliveries of the 378/0 units have been continuing, just more slowly with units 006 and 003 delivered this month. |
ELL coming sooner not later
On 24.01.10 11:19, Andy wrote:
On Jan 20, 9:28 am, "Paul wrote: wrote in message ... On 19.01.10 22:38, Paul Scott wrote: "Paul wrote in message ... One thing I would like to understand is whether it will be possible for TfL to run any sort of "ghost" timetable south of New Cross Gate on NR metals prior to 23/5/10? Given that a major recast of Southern services is required there must be a risk that LOROL "debug" the new bit north of New Cross Gate but then find it a struggle to get to grips with the service carrying on to Crystal Palace and West Croydon. News just in Paul. A supplementary track access has been agreed, allowing for 15 slots per day in each direction from 17th Jan until the timetable change date: http://www.rail-reg.gov.uk/upload/pd...ion-letter.pdf I read elsewhere that the signalled connections to NR were meant to come into full time use last weekend, but the up connection signals at least were bagged over today . Still, should see some 378s out and about through Sydenham pretty soon now... I would imagine that there are plenty to go around if building work is finished and approved ahead of schedule? The 378s? Somewhat behind schedule I think, although there are plenty of the ELL variety available now. 10 or more units sitting at NXG depot as of yesterday. But 378/0s for the NLL/DC lines seem to have ceased being delivered for the moment. The deliveries of the 378/1s for the ELL are pretty much on schedule (I think units 136-152 have already arrived, just leaving 132-135 and 153 still to come). The rate of deliveries of the 378/0s may have slowed down, but there have been at least two arriving at Willesden this month (006 and 003). Is that why 313s are still operating on the line? Because I had heard that they were due to be pulled from NLL by December, yet they are still running. |
ELL coming sooner not later
On Jan 24, 2:03*pm, "
wrote: On 24.01.10 11:19, Andy wrote: On Jan 20, 9:28 am, "Paul wrote: *wrote in message ... On 19.01.10 22:38, Paul Scott wrote: "Paul * *wrote in message m... One thing I would like to understand is whether it will be possible for TfL to run any sort of "ghost" timetable south of New Cross Gate on NR metals prior to 23/5/10? * Given that a major recast of Southern services is required there must be a risk that LOROL "debug" the new bit north of New Cross Gate but then find it a struggle to get to grips with the service carrying on to Crystal Palace and West Croydon. News just in Paul. A supplementary track access has been agreed, allowing for 15 slots per day in each direction from 17th Jan until the timetable change date: http://www.rail-reg.gov.uk/upload/pd...ion-letter.pdf I read elsewhere that the signalled connections to NR were meant to come into full time use last weekend, but the up connection signals at least were bagged over today . Still, should see some 378s out and about through Sydenham pretty soon now... I would imagine that there are plenty to go around if building work is finished and approved ahead of schedule? The 378s? Somewhat behind schedule I think, although there are plenty of the ELL variety available now. 10 or more units sitting at NXG depot as of yesterday. *But 378/0s for the NLL/DC lines seem to have ceased being delivered for the moment. The deliveries of the 378/1s for the ELL are pretty much on schedule (I think units 136-152 have already arrived, just leaving 132-135 and 153 still to come). The rate of deliveries of the 378/0s may have slowed down, but there have been at least two arriving at Willesden this month (006 and 003). Is that why 313s are still operating on the line? Because I had heard that they were due to be pulled from NLL by December, yet they are still running. Yes, there are not quite enough commissioned 378s for the NLL to switch completely over (I think there are 16 diagrams on the NLL and WLL combined and units on the two routes intermix in the peaks). The units still don't appear to be allowed in service on the DC lines, something to do with the one person operation. |
ELL coming sooner not later
|
ELL coming sooner not later
On Jan 24, 2:40*pm, wrote:
In article , (Andy) wrote: The units still don't appear to be allowed in service on the DC lines, something to do with the one person operation. Huh? They can't run over the whole NLL/WLL? Or they can't go on the ELL? Why would DOO come into it? The DC lines being the Euston - Watford 'local' lines. This is the only route where LO use Driver Only Operation, hence delays in introducing the 378s. |
ELL coming sooner not later
On 24 Jan, 14:53, Paul Corfield wrote:
On Sun, 24 Jan 2010 08:40:03 -0600, wrote: In article , (Andy) wrote: The units still don't appear to be allowed in service on the DC lines, something to do with the one person operation. Huh? They can't run over the whole NLL/WLL? Or they can't go on the ELL? Why would DOO come into it? They clearly can run on the NLL and WLL - they do say M-S. There's next to no Sunday *service at present. I think the reference is to the Euston - Watford service which was always going to be last to get the 378s. I've not read or seen a photo saying that they have run on the Watford DC service yet. They've certainly been physically there, but presumably not in passenger service (one can't tell as one passes on another track). There was one at Euston on Thursday. |
ELL coming sooner not later
On Jan 24, 2:53*pm, Paul Corfield wrote:
On Sun, 24 Jan 2010 08:40:03 -0600, wrote: In article , (Andy) wrote: The units still don't appear to be allowed in service on the DC lines, something to do with the one person operation. Huh? They can't run over the whole NLL/WLL? Or they can't go on the ELL? Why would DOO come into it? They clearly can run on the NLL and WLL - they do say M-S. There's next to no Sunday *service at present. They also run the Shepherd's Bush - Clapham Junction Sunday service (I think both diagrams here are now scheduled 378s). I think the reference is to the Euston - Watford service which was always going to be last to get the 378s. I've not read or seen a photo saying that they have run on the Watford DC service yet. They've run one passenger service on the Watford service, some time ago. I think this train had a second driver acting as conductor for operating the doors. They do spend a fair amount of time running back and forward Euston - Watford Junction on commissioning runs. |
ELL coming sooner not later
On Jan 24, 2:40*pm, wrote: (Andy) wrote: The units still don't appear to be allowed in service on the DC lines, something to do with the one person operation. Huh? They can't run over the whole NLL/WLL? Or they can't go on the ELL? Why would DOO come into it? The "DC Line(s)" is one of the names given to the Watford Junction to Euston local line - i.e. the one with the stopping service - it's also known as the "New Line". The DC Line name comes from the fact they're electrified by DC third rail / fourth rail on the joint running section with the Bakerloo. The service is now run by London Overground (used to be Silverlink Metro) and appears on the Tube map. The NLL/WLL were never converted for DOO, but the DC Line was. For whatever reason there's some issue with the 378s running on DOO mode, so they haven't appeared in service on the DC Line. |