London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #5   Report Post  
Old April 12th 10, 02:32 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Apr 2010
Posts: 3
Default Upgrading sub surface tube lines to 750V

Basil Jet wrote:
On 12/04/2010 14:56, d wrote:

Raising the voltage does seem an odd thing to do not least because
they dropped
the voltage from 640V years ago citing power saving reasons (which
sounds like
rubbish TBH , lower voltages are less efficient , not more).


... unless the lower voltages leak less.


Lower voltage means a higher current draw for the same power, and
transmission losses are proportional to I^2.

Rgds

Denis McMahon


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
West London Sub-Regional Transport Plan Slidecage London Transport 1 June 28th 11 10:32 AM
New KXSP sub surface station kytelly London Transport 9 July 31st 06 06:24 PM
TfL / NLL / Metronet surface stock / tube stock / Croxley link John B London Transport 4 March 8th 06 09:51 PM
Upgrading GNER ticket to First Class Cameron Davies London Transport 1 April 14th 04 02:39 AM


All times are GMT. The time now is 05:38 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017