Default Barking - Gospel Oak line

In message , at 23:30:19 on Wed, 16 Jun
2010, Richard J. remarked:
In the rules of the route do they quote the available/useable length or
the actual length? After all, some stations in some parts of the
country have parts of their platforms fenced off.


I'm not familiar with the ROTR deliverables, so can't say. One easy
spot-check would Loughborough - where not only is the southern end of
both main platform "out of bounds" as a result of a low bridge, but the
far northern end of the up platform also is also barred (using those
triangular wooden anti-pedestrian bars you normally see at level
crossings).


From the 2010 Rules of the Plan:

Loughborough
Platform 1 110 m Reduced availability due to safety risks
Platform 2 107 m Reduced availability due to safety risks
Platform 3 58 m Can *only* accomadate [sic] 5 cars or less


How could you get 5 cars into a 58-metre platform?


I suspect that's a note which is meant to apply to Platforms 1&2. In
practice Platform 3 will never see more than a 3-car.
--
Roland Perry

  #2   Report Post  
Old June 17th 10, 05:57 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2009
Posts: 664
Default Barking - Gospel Oak line

Roland Perry wrote on 17 June 2010 17:50:52 ...
In , at 23:30:19 on Wed, 16 Jun
2010, Richard remarked:
In the rules of the route do they quote the available/useable length or
the actual length? After all, some stations in some parts of the
country have parts of their platforms fenced off.

I'm not familiar with the ROTR deliverables, so can't say. One easy
spot-check would Loughborough - where not only is the southern end of
both main platform "out of bounds" as a result of a low bridge, but the
far northern end of the up platform also is also barred (using those
triangular wooden anti-pedestrian bars you normally see at level
crossings).


From the 2010 Rules of the Plan:

Loughborough
Platform 1 110 m Reduced availability due to safety risks
Platform 2 107 m Reduced availability due to safety risks
Platform 3 58 m Can *only* accomadate [sic] 5 cars or less


How could you get 5 cars into a 58-metre platform?


I suspect that's a note which is meant to apply to Platforms 1&2. In
practice Platform 3 will never see more than a 3-car.


I've just checked the 2011 version (presumably still in draft - next
update 9 July), and the comment against Platform 3 has been removed.
The numbers for all three platforms and the comments on platforms 1 & 2
are unchanged.
--
Richard J.
(to email me, swap 'uk' and 'yon' in address)


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Barking - Gospel Oak line Tom Anderson London Transport 0 June 17th 10 10:24 PM
Gospel Oak - Barking Toby London Transport 8 June 26th 07 12:37 PM
Gospel Oak-Barking Andrea London Transport 16 March 8th 07 07:37 PM
Gospel Oak - Barking Slim London Transport 1 July 21st 04 12:26 PM


All times are GMT. The time now is 09:17 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017