London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old May 30th 11, 02:24 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2004
Posts: 341
Default South Tottenham and GOBLIN electrification

I have read in these newsgroups that the only two things holding up
the electrification of the GOBLIN and the implementation of 378s on
this route are the short platforms at South Tottenham station
(necessitated by the junctions at either end) and the inability to
find funding for the electrification. Are both of these problems still
without solutions, or are there solutions available awaiting the
necessary funding (which won't arrive until 2016 at the earliest
IMHO)?

Also, are the 172s any good? I've not sampled them yet so I'm
interested to know if the GOBLIN has had a mini-sparks effect thanks
to the newer trains.
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
GOBLIN: FURTHER ELECTRIFICATION WORK. [email protected] London Transport 11 November 27th 17 02:29 PM
Goblin to close for Electrification work Jim Chisholm London Transport 12 February 18th 16 12:53 AM
Goblin electrification Basil Jet[_4_] London Transport 47 October 19th 15 05:27 PM
Goblin electrification [email protected] London Transport 0 October 2nd 15 10:33 AM
Goblin electrification Mark Bestley[_2_] London Transport 0 October 2nd 15 10:16 AM


All times are GMT. The time now is 12:32 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017