London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old September 30th 15, 04:37 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Sep 2014
Posts: 1,385
Default Goblin electrification

.... the timescale was rumoured to be slipping, according to Modern
Railways, but the contract has now been let.

http://www.railtechnologymagazine.co...orewrite=false

I had no idea that Barking platform one was not electrified! Won't it
become disused when the Barking Reach extension is built?

  #2   Report Post  
Old September 30th 15, 09:01 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jan 2015
Posts: 355
Default Goblin electrification

Basil Jet wrote:
... the timescale was rumoured to be slipping, according to Modern
Railways, but the contract has now been let.

http://www.railtechnologymagazine.co...orewrite=false

I had no idea that Barking platform one was not electrified! Won't it
become disused when the Barking Reach extension is built?


Always useful to have a diversionary option if there's a problem somewhere!


Anna Noyd-Dryver
  #3   Report Post  
Old September 30th 15, 09:56 PM
Senior Member
 
First recorded activity at LondonBanter: Feb 2011
Location: Leyton, East London
Posts: 902
Default

Quote:
Originally Posted by Basil Jet[_4_] View Post
.... the timescale was rumoured to be slipping, according to Modern
Railways, but the contract has now been let.

http://www.railtechnologymagazine.co...orewrite=false

I had no idea that Barking platform one was not electrified! Won't it
become disused when the Barking Reach extension is built?
I'm very pleased they have brought the costs down. As a resident of
Leyton I often find this service useful.

I didn't see any reference to platforms being lengthened. I assume
that will have to wait until patronage has increased. (If they re-opened
the route through to St. Pancras, patronage would increase very rapidly!)
  #4   Report Post  
Old October 1st 15, 12:55 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default Goblin electrification

In article ,
(Paul Corfield) wrote:

On Wed, 30 Sep 2015 17:37:21 +0100, Basil Jet
wrote:

... the timescale was rumoured to be slipping, according to Modern
Railways, but the contract has now been let.


http://www.railtechnologymagazine.co...to-carry-out-e
lectrification-of-gospel-oak-barking-route?dorewrite=false

I had no idea that Barking platform one was not electrified! Won't it
become disused when the Barking Reach extension is built?


In theory yes but I'd want a bolt hole for the trains in case a
freight train does something stupid east of Barking or C2C have a rare
breakdown. Makes no sense to throw away an important facility and we
haven't got the TWA process started never mind signed off for the
Barking Riverside extension. New Mayor in May 2016 may have other
ideas [1] that could force a change in requirements.

[1] e.g. build a tunnel to Thamesmead as part of the initial scope or
a very early follow on piece of work. That'd force different
requirements at Barking Reach that could affect the scope of the TWAO.


Trouble is that there are two electrification systems at Barking. Platform 1
isn't ideally situated for overhead electrification.

--
Colin Rosenstiel
  #5   Report Post  
Old October 1st 15, 06:48 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default Goblin electrification

Robin9 wrote:
'Basil Jet[_4_ Wrote:
;150369'].... the timescale was rumoured to be slipping, according to
Modern
Railways, but the contract has now been let.

http://tinyurl.com/ns5psws

I had no idea that Barking platform one was not electrified! Won't it
become disused when the Barking Reach extension is built?


I'm very pleased they have brought the costs down. As a resident of
Leyton I often find this service useful.

I didn't see any reference to platforms being lengthened. I assume
that will have to wait until patronage has increased. (If they
re-opened
the route through to St. Pancras, patronage would increase very
rapidly!)


Are the platforms already long enough for four-car trains?


  #6   Report Post  
Old October 1st 15, 08:55 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 464
Default Goblin electrification

In article ,
Recliner wrote:
[the goblin]
Are the platforms already long enough for four-car trains?


No. Most stations that used to have longer platforms have had the
length beyond two car closed. This would be easy to fix - repoint
the brickwork, repaint all the things, etc. But South Tottenham
would be more challenging - extending westwards is tricky becuase
there's a bridge over the A10 that way; extending eastwards is
tricky becuae there's a junction that way. Google maps will give
you a picture - literally.

Cheers,
Mike

--
Mike Bristow

  #8   Report Post  
Old October 1st 15, 02:24 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2014
Posts: 1,385
Default Goblin electrification

On 2015\10\01 09:55, Mike Bristow wrote:
In article ,
Recliner wrote:
[the goblin]
Are the platforms already long enough for four-car trains?


No. Most stations that used to have longer platforms have had the
length beyond two car closed. This would be easy to fix - repoint
the brickwork, repaint all the things, etc. But South Tottenham
would be more challenging - extending westwards is tricky becuase
there's a bridge over the A10 that way; extending eastwards is
tricky becuae there's a junction that way. Google maps will give
you a picture - literally.


Google maps suggests that you could easily double the length of the
platforms without running into the junction or the A10.

  #9   Report Post  
Old October 1st 15, 04:43 PM
Senior Member
 
First recorded activity at LondonBanter: Feb 2011
Location: Leyton, East London
Posts: 902
Default

The solution at South Tottenham is the one they used at
Mitcham Eastfields: platforms that don't line up opposite each
other. Eastbound the platform would pass (include) the junction
and westbound the platform would have to extend across the
High Road on a bridge. Expensive but not difficult.
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
GOBLIN: FURTHER ELECTRIFICATION WORK. [email protected] London Transport 11 November 27th 17 02:29 PM
Goblin to close for Electrification work Jim Chisholm London Transport 12 February 18th 16 12:53 AM
Goblin electrification [email protected] London Transport 0 October 2nd 15 10:33 AM
Goblin electrification Mark Bestley[_2_] London Transport 0 October 2nd 15 10:16 AM
South Tottenham and GOBLIN electrification TheOneKEA London Transport 34 June 3rd 11 09:01 PM


All times are GMT. The time now is 06:22 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017