Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On Jun 1, 11:23*pm, TheOneKEA wrote:
On Jun 1, 4:27*pm, D7666 wrote: On Jun 1, 5:17*pm, Jamie *Thompson wrote: Well, there was mooting that if demand continues to rise then we might see 5-car trains In a different presentation on ELL , 5car 378s are not permanently ruled out, even on the ELL itself. Cue stage left uk.r protests *... ... anyway the 2 people giving the presentation were the top projects bods from LU and NR and 5car with SDO is a possibility. That at least implies that the manufacturing components needed to build more Class 378 bodyshells haven't been reconfigured, which is good news if a whole new set of units needs to be built. I would hope that the class 378 manufacturing equipment is still available, as there are still three units (255-257) to be delivered, for the ELL extension to Clapham Junction. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
GOBLIN: FURTHER ELECTRIFICATION WORK. | London Transport | |||
Goblin to close for Electrification work | London Transport | |||
Goblin electrification | London Transport | |||
Goblin electrification | London Transport | |||
Goblin electrification | London Transport |