Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On Jun 2, 12:02*am, D7666 wrote:
On Jun 1, 11:23*pm, TheOneKEA wrote: On Jun 1, 4:27*pm, D7666 wrote: On Jun 1, 5:17*pm, Jamie *Thompson wrote: Well, there was mooting that if demand continues to rise then we might see 5-car trains In a different presentation on ELL , 5car 378s are not permanently ruled out, even on the ELL itself. Cue stage left uk.r protests *... ... anyway the 2 people giving the presentation were the top projects bods from LU and NR and 5car with SDO is a possibility. That at least implies that the manufacturing components needed to build more Class 378 bodyshells haven't been reconfigured, which is good news if a whole new set of units needs to be built. Not necessary ... re-form 378 and turn the present 4car units into say 3car and 5car and make enough 5car units for the ELL., and acquire something else to make up the loss and/or expand other LOROL routes. Any 3 car units would only really be of use on GOBLIN (and would probably need lengthening soon afterwards anyway), all the other LO routes need at least the 4 car units already in use, but 2 x 3 car units would need more units anyway. You could just order a fifth car, of class 379 exterior design, for the current units and add some more 5 car units (with class 379 exterior/doors) onto the order, it shouldn't be too expensive to replace the coach ends with the wider ganway version needed for interiors like the class 378s. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
GOBLIN: FURTHER ELECTRIFICATION WORK. | London Transport | |||
Goblin to close for Electrification work | London Transport | |||
Goblin electrification | London Transport | |||
Goblin electrification | London Transport | |||
Goblin electrification | London Transport |