Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#8
![]() |
|||
|
|||
![]()
Pat Duffy typed
I went from Fulham Broadway (Zone 2) to Old Street (Zone 1) yesterday intending to change from the District to the Northern at Bank/Monument. However the passageway was closed and there are signs directing everyone to make this connection at street level. I am quite disturbed that I was charged £2.00 for the Fulham - Bank/Monument district line bit and a further £1.60 for the Bank/Monument to Old Street bit, it's hardly my fault that the subway or escalators or whatever are being rebuilt and it is necessary to leave and reenter the station because of this work. I did not stop anywhere between the two platforms, I went directly from one to the other via the signposted route. The station staff at Old Street had no idea how to fix it. I shall have to call the Oystercard helpline I guess. I find this tale rather worrying. I envisage cases when a passenger is too rushed to check what he has been charged and may not have the time to rectify matters later. -- Helen D. Vecht: Edgware. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
6$ into $10 000? THIS REALLY WORKS!!!! | London Transport | |||
Validity of +Any Permnitted during engineering works | London Transport | |||
Euston Square station works | London Transport | |||
Planned engineering works | London Transport | |||
Planned engineering works | London Transport |