Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
Pat Duffy typed
No, it was a different chap the 2nd time, and it was a morning (11.30am) as opposed to the afternoon (4pm) slot that previous visits had been in. Maybe they only trained one shift, because it was Fulham Broadway that also told me that there was no such thing as Oyster Prepay in mid December, a good week or two after it was announced by TFL. That's about when I was told at Burnt Oak to wait with applying for Oyster Pre Pay until 4 January. That and the failure to issue me with one on 4 January has cost me quite a few pennies :-( I am still angry about the lack of staff training. -- Helen D. Vecht: Edgware. |
#2
![]() |
|||
|
|||
![]()
Staff training on oyster pre-pay was done a few months ago. Since then the
rules have changed and also the menu's on the machines. This plus the fare revision plus holidays has meant there is a inconsistency in the individuals knowleadge. This actually happens every year during fare revision but usually settles down after a few months. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
6$ into $10 000? THIS REALLY WORKS!!!! | London Transport | |||
Validity of +Any Permnitted during engineering works | London Transport | |||
Euston Square station works | London Transport | |||
Planned engineering works | London Transport | |||
Planned engineering works | London Transport |