Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#26
![]() |
|||
|
|||
![]() "Bruce" wrote in message ... Roland Perry wrote: In message , at 10:41:35 on Tue, 11 Oct 2011, Bruce remarked: The proposal for a second runway is a little over 1km to the south of the existing one, with the new (third) terminal between the runways. There is no proposal for a second runway. Legally, there can be no such proposal until 2019. There has been a proposal since at least 2005 (I've been quoting from the BAA documents). No doubt the new owners considered such proposals before buying - it would be an insane leap in the dark not to. What they can't do is *start building* until 2019. I originally thought they couldn't apply for planning permission until 2019, but it's not even that. That is what I thought too. I researched it in some detail in the 1990s as I lived in an area of Sussex that already had quite a lot of aircraft noise and would have had more if the changes had gone ahead. It was quite clear at that time that a second runway could not even be considered before 2019. I wonder when that changed, If not before, it will have changed when BAA was privatised as there is no way that you could force a company to abide by such a rule tim |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
PAYG now live on SE Highspeed twixt St Pancras and Stratford | London Transport | |||
Decision on Croxley Rail Link due 'in next two weeks' | London Transport | |||
Thameslink up the spout again - sig problem twixt Cricklewood and Radlett | London Transport | |||
"Heathrow and Gatwick airports: Ministers mull rail link" (twixt | London Transport | |||
Oyster PAYG twixt Viccy and Balham | London Transport |