Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#8
![]() |
|||
|
|||
![]()
On 29/12/2011 13:10, EE507 wrote:
On Dec 29, 12:15 pm, Oliver wrote: wrote: Date: Fri, 16 Dec 2011 00:21:23 +0100 From: Subject: Single point of failure in the Berlin Train System The Berlin light rail train system, plagued by problems for years, demonstrated today that it can, indeed get worse. Many cars have been taken out of service for all sorts of ailments, and having pruned the maintenance shops and the drivers to a bare minimum, there is no room for dealing with problems. And there have been problems galore. The Berlin S-Bahn getting "pruned" a little bit concerning staff still needs significantly more staff per passenger kilometre, passenger carried, train or seat kilometres or network length offered than any other S-Bahn system in Germany. Why do they still use platform dispatchers? Why not use the signalling system to regulate trains? The signals refer to the ROW only. Platform dispatchers on the Berlin S-Bahn exist to spot the platform and make sure that the doors are closed, that nobody is caught in train doors and to signal the train to depart. We have the exact same system here in London. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
S Stock in Berlin | London Transport | |||
Why was Waterloo shutdown on Wednesday the 6th, 8:30am? | London Transport | |||
top up wrong Oyster (almost) | London Transport | |||
Northern Line early shutdown on Tuesday 24/02/2004 | London Transport | |||
Brian Hardy talks about Berlin U-Bahn and S-Bahn in St Albans on Thursday | London Transport |