Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#10
|
|||
|
|||
Complete (almost) Shutdown of Berlin Train System - could it
On Thu, 29 Dec 2011 21:51:41 +0000
Charles Ellson wrote: On Thu, 29 Dec 2011 12:31:20 +0000 (UTC), d wrote: On 29 Dec 2011 12:16:58 GMT Hans-Joachim Zierke wrote: Without the angry passengers, it might have been 1 hour. "Persons on the tracks" means, that operation can't resume, even with everything back to normal. People are not dumb cattle and will not just sit on a train with no information forever if they can get out and continue their journey on foot. So not dumb cattle but still a bit thick WRT hazard awareness ? Perhaps they are. They're going to get off though. B2003 |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
S Stock in Berlin | London Transport | |||
Why was Waterloo shutdown on Wednesday the 6th, 8:30am? | London Transport | |||
top up wrong Oyster (almost) | London Transport | |||
Northern Line early shutdown on Tuesday 24/02/2004 | London Transport | |||
Brian Hardy talks about Berlin U-Bahn and S-Bahn in St Albans on Thursday | London Transport |