London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #12   Report Post  
Old January 13th 12, 06:07 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2008
Posts: 512
Default Hammersmith Flyover to reopen to light traffic - BBC News

In message , Bruce
writes

So Hammersmith is very much a one-off. That doesn't mean that other
structures don't have problems of their own, but the design and
subsequent operation and maintenance practice related to the
Hammersmith flyover seems to have combined in a way that could only
end in tears.


No matter. There's little doubt that the prospect of all those Olympic
athletes and officials setting out in their limousines from Heathrow,
only to encounter the traffic jams that those of us who live in the area
currently suffer, will ensure that it is all fixed in record time.
--
Paul Terry
  #13   Report Post  
Old January 13th 12, 06:53 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2009
Posts: 1,018
Default Hammersmith Flyover to reopen to light traffic - BBC News

Paul Terry wrote:
In message , Bruce
writes

So Hammersmith is very much a one-off. That doesn't mean that other
structures don't have problems of their own, but the design and
subsequent operation and maintenance practice related to the
Hammersmith flyover seems to have combined in a way that could only
end in tears.


No matter. There's little doubt that the prospect of all those Olympic
athletes and officials setting out in their limousines from Heathrow,
only to encounter the traffic jams that those of us who live in the area
currently suffer, will ensure that it is all fixed in record time.



If it is for the Olympics, it will be Money No Object.

  #14   Report Post  
Old January 14th 12, 09:21 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Hammersmith Flyover to reopen to light traffic - BBC News

In message , at 12:36:40
on Fri, 13 Jan 2012, remarked:
There were extensive repairs to the M6 viaduct in the Castle Bromwich
area a couple of years ago, and the A14 flyover across Huntingdon
station is widely regarded as being about to fall down. One of the
bridges at the M6/M1 junction was replaced very recently.

http://www.bbc.co.uk/news/uk-england-16460505

Not sure how many of these are salt related.


Huntingdon viaduct already relies on extensive supplementary steelwork to
support it.


But why does it *need* the support? Is the underlying issue one of salt
corrosion.
--
Roland Perry
  #15   Report Post  
Old January 14th 12, 12:10 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Apr 2011
Posts: 6
Default Hammersmith Flyover to reopen to light traffic - BBC News

On Fri, 13 Jan 2012 13:09:44 +0000, Roland Perry
wrote:



There were extensive repairs to the M6 viaduct in the Castle Bromwich
area a couple of years ago, and the A14 flyover across Huntingdon
station is widely regarded as being about to fall down. One of the
bridges at the M6/M1 junction was replaced very recently.


I recall the Sunday Times getting excited about the M6 viaducts being
at risk of collapse in Birmingham, must have been in the 1970s or
'80s. The recent works are the second time they have had a thorough
going over that I am aware of.
The M6 bridge over the M1 was propped about 10 years ago. I don't know
what weakened it: poor design, over-use or salt, could have been any
of them.


  #16   Report Post  
Old January 14th 12, 12:37 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2009
Posts: 1,018
Default Hammersmith Flyover to reopen to light traffic - BBC News

Peter Johnson wrote:
On Fri, 13 Jan 2012 13:09:44 +0000, Roland Perry
wrote:
There were extensive repairs to the M6 viaduct in the Castle Bromwich
area a couple of years ago, and the A14 flyover across Huntingdon
station is widely regarded as being about to fall down. One of the
bridges at the M6/M1 junction was replaced very recently.


I recall the Sunday Times getting excited about the M6 viaducts being
at risk of collapse in Birmingham, must have been in the 1970s or
'80s.



80s. The problem was that the client deleted the sliding bearings
that were needed to allow for movement, including thermal expansion
and contraction, and replaced them with grease. Literally.

Within months, the grease dried out and the beams seized on to their
supports. So movement was no longer possible and temperature changes
put massive stresses into the structure.


The M6 bridge over the M1 was propped about 10 years ago. I don't know
what weakened it: poor design, over-use or salt, could have been any
of them.



As with many highway structures, the vast increase in the allowable
gross weight of the biggest lorries has created no end of problems.
The damage done to the road itself is proportional to the fourth power
of the axle weight of the vehicle. There must be a comparable
relationship between gross vehicle weight and the effect on
structures.

  #19   Report Post  
Old January 14th 12, 10:56 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default Hammersmith Flyover to reopen to light traffic - BBC News

In article ,
() wrote:

On Sat, 14 Jan 2012 15:34:09 -0600,

wrote:

In article ,

(Roland Perry) wrote:

In message , at
12:36:40 on Fri, 13 Jan 2012,
remarked:

Huntingdon viaduct already relies on extensive supplementary steelwork
to support it.

But why does it *need* the support? Is the underlying issue one of
salt corrosion.


I don't think so. I think it's to do with the quality of the original
concrete construction.


I don't think that it's just the concrete, it's a broader design
concept than that;


http://londonist.com/2012/01/will-so...wrong-with-the
-hammersmith-flyover.php

E&OE etc.


Thanks for the link to an interesting article (with a few errors picked up
in the comments) but I was referring to quite a different structure on the
A14.

--
Colin Rosenstiel
  #20   Report Post  
Old January 15th 12, 05:14 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2009
Posts: 1,018
Default Hammersmith Flyover to reopen to light traffic - BBC News

wrote:

On Sat, 14 Jan 2012 15:34:09 -0600,

wrote:

In article ,
(Roland Perry)
wrote:

In message , at
12:36:40 on Fri, 13 Jan 2012,
remarked:

Huntingdon viaduct already relies on extensive supplementary steelwork to
support it.

But why does it *need* the support? Is the underlying issue one of
salt corrosion.


I don't think so. I think it's to do with the quality of the original
concrete construction.


I don't think that it's just the concrete, it's a broader design
concept than that;

http://londonist.com/2012/01/will-so...th-flyover.php

E&OE etc.



Errors and Omissions Excepted??

There are plenty of potential errors in that article, but no
omissions. Rarely have I seen someone make such a complex explanation
of a very simple problem. Probably due to his lack of knowledge of
this particular structure, the author seems to have wanted to cover
all the possible problems in all possible concrete bridge structures.
Perhaps he did omit two possibilities - cosmic rays and UFO impact.
And then there's terrorist attack, so let's make that three. ;-)



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Hammersmith flyover closed for three weeks from Aug 1st Oliver Keating London Transport 8 July 21st 03 02:21 PM
Hammersmith flyover closed for three weeks from Aug 1st CJG London Transport 0 July 13th 03 04:47 PM
Hammersmith flyover closed for three weeks from Aug 1st AstraVanMan London Transport 0 July 13th 03 09:11 AM
Hammersmith flyover closed for three weeks from Aug 1st kedron London Transport 0 July 12th 03 11:27 PM
Hammersmith flyover closed for three weeks from Aug 1st Oliver Keating London Transport 0 July 12th 03 10:12 PM


All times are GMT. The time now is 07:16 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017