Crossrail tunnelling to start shortly
"Paul Corfield" wrote in message
... i believe Network Rail are in the design phase for Great Western electrification so work is happening even if nothing obvious has turned up "on site". There's plenty of infrastructure clearance work going on now, mainly track lowering and bridge rebuilding. A significant number of overbridge sites on the stretch between Reading and Didcot looked like a disaster zone just after the Christmas and New Year break. Civils work of similar nature has just started between Reading and Newbury as well. The actual wires will only appear much later, but the civils part of the project is definitely underway... Paul S |
#2
|
|||
|
|||
Crossrail tunnelling to start shortly
"Paul Scott" wrote There's plenty of infrastructure clearance work going on now, mainly track lowering and bridge rebuilding. A significant number of overbridge sites on the stretch between Reading and Didcot looked like a disaster zone just after the Christmas and New Year break. Civils work of similar nature has just started between Reading and Newbury as well. The bridge rebuilding was done as part of Southampton to Midlands freight gauge enhancement (though was done to giver clearance for OHLE as well). Peter |
#3
|
|||
|
|||
Crossrail tunnelling to start shortly
"Peter Masson" wrote in message
... The bridge rebuilding was done as part of Southampton to Midlands freight gauge enhancement (though was done to giver clearance for OHLE as well). The gauge enhancement for W10 had already been competed early last year though Peter, W10 trains were already running by March. These latest works were definitely being announced locally as being for electrification clearance. Discussions elsewhere suggested that at some bridges track lowering was found to allow just enough clearance for the W10, so the work at those was put on the back burner until electrification was fully confirmed. Paul |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Crossrail tunnelling complete | London Transport | |||
Crossrail tunnelling complete | London Transport | |||
Jubilee line tunnelling this weekend? | London Transport | |||
Crossrail tunnelling pictures | London Transport | |||
Crossrail tunnelling to start shortly | London Transport |