Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
- BEGIN TRANSMISSION -
First S7 production train arrives in London Another key milestone for the SSR upgrade Last Wednesday, 30 May, the first S7 train was delivered to Neasden depot for commissioning and preparation for the S7 preview service. The train has a few changes from the S8 with the obvious being one less car and an all longitudinal seating layout. Another three S7 trains are scheduled for delivery before the Olympics so that the current three S8-test trains (less one car), being used for S7 infrastructure integration testing can be amalgamated into the S8 fleet prior to the introduction of our 2012 Games service. Paul Coote, SSR Upgrades Delivery Manager said: "The arrival of our first S7 train means that we are entering another exciting upgrade phase. "This represents a key milestone for S7 delivery and is the result of a great deal of collaborative working with CPD, the line team and APD to see the new train through build, fault-free running at Old Dalby and integration testing on LU track, ahead of its introduction into service this summer. - END TRANSMISSION - |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Boris: Crossrail not yet "signed, sealed and delivered" [was:Transport Secretary vows to finish Crossrail] | London Transport | |||
Neasden Depot | London Transport | |||
Neasden Depot | London Transport | |||
Children In Neasden | London Transport | |||
Neasden Depot | London Transport |