Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#30
![]() |
|||
|
|||
![]()
On Fri 08 Jun 2012, Pete wrote:
"Brian" wrote in message b.com... Graeme Wall explained on 08/06/2012 : You would have thought so :-0 The problem is there are too many miniature connectors for things like power supply and servo controls to the lens. Also radio link equipment is notoriously finicky in wet weather. There were also problems with the sound equipment on the orchestra boat caused by the weather. Maybe in view of the weather forecast if someone had have bought some of those big Union jack umbrellas everyone would have been better off. Of Course ! " There were also problems with the sound equipment on the orchestra boat caused by the weather." Caused by incompetence more-like. Bad weather was clearly forecast - the choir should have been provided with cover of some sort. I felt really sorry for them. I was told that the music had been pre recorded during a rehearsal for this kind if eventuality. Either my information was wrong or they just forgot to use the backup! Either way the singers should been provided with cover - it was a disgrace and an insult to them! Cheers John -- John Bennett johndotbennettatsmartemaildotcodotuk |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
BBC's Dire Coverage of the Thames Flotilla and other Jubillee Events | London Transport | |||
Well I enjoyed it - the Flotilla | London Transport | |||
BBC: Thames cable car given go-ahead | London Transport | |||
Mobile phone coverage on the Waterloo and City line | London Transport |