Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On 8 Jan, 17:25, "Peter Masson"
wrote: "Andy" *wrote LU are implementing a metro style ATO system (whether they should have used one of their existing implementations is a different argument).Given that there is no working ATO system on the national system, why try and claim that there is? The system which they are implementing will at least talk to trains with the Chiltern ATP system. When the SSL upgrade was being planned, was any thought given to handing the Harrow - Moor Park fast lines, and the entire route and service to Amersham and Chesham over to Network Rail and Chiltern? There would be disadvantages (e.g. no through trains from Amersham to the City) but simplification should give a more robust service. If the Wycombe route ever becomes part of HS2, or Crossrail, Transferring the Met. fast lines, north of Harrow-on-the-Hill, to Chiltern, would seem to be the way to go. One cannot imagine Amersham and Chesham commuters are thrilled with S8 stock. Moreover the plethora of signalling systems is, almost, destined to induce failures. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Northern Line Signalling | London Transport | |||
Victoria line signalling | London Transport | |||
Victoria line signalling | London Transport | |||
Baker St.(Met) and Met operations | London Transport | |||
LU multiple-aspect signalling | London Transport |