London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old June 10th 14, 08:12 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Dec 2008
Posts: 2,008
Default New Crossrail 2 route

Graeme Wall wrote:
http://www.bbc.co.uk/news/uk-england-london-27764476


There's already a thread in uk.t.l, with a link to this more detailed
consultation document:
https://consultations.tfl.gov.uk/crossrail/june-2014

  #2   Report Post  
Old June 10th 14, 03:29 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Dec 2006
Posts: 836
Default New Crossrail 2 route



"Recliner" wrote in message
...
Graeme Wall wrote:
http://www.bbc.co.uk/news/uk-england-london-27764476


There's already a thread in uk.t.l, with a link to this more detailed
consultation document:
https://consultations.tfl.gov.uk/crossrail/june-2014


whatever happened to the simple option of connecting Waterloo to KX?

This tunnel all the way from Wimbledon to Tottenham looks like a recipe for
it never getting built (because it is too expensive)



tim



  #3   Report Post  
Old June 10th 14, 06:56 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Feb 2013
Posts: 704
Default New Crossrail 2 route

On Tue, 10 Jun 2014 17:29:39 +0200
"tim....." wrote:
"Recliner" wrote in message
...
Graeme Wall wrote:
http://www.bbc.co.uk/news/uk-england-london-27764476


There's already a thread in uk.t.l, with a link to this more detailed
consultation document:
https://consultations.tfl.gov.uk/crossrail/june-2014


whatever happened to the simple option of connecting Waterloo to KX?

This tunnel all the way from Wimbledon to Tottenham looks like a recipe for
it never getting built (because it is too expensive)


Given how busy north and south london mainline railways are I'm not sure
crossrail 2 is viable from a service point of view. Perhaps they should just
build the hackney tube instead.

--
Spud


  #4   Report Post  
Old June 10th 14, 07:43 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2011
Posts: 31
Default New Crossrail 2 route


wrote in message
...
On Tue, 10 Jun 2014 17:29:39 +0200
"tim....." wrote:
"Recliner" wrote in message
...
Graeme Wall wrote:
http://www.bbc.co.uk/news/uk-england-london-27764476

There's already a thread in uk.t.l, with a link to this more detailed
consultation document:
https://consultations.tfl.gov.uk/crossrail/june-2014


whatever happened to the simple option of connecting Waterloo to KX?

This tunnel all the way from Wimbledon to Tottenham looks like a recipe
for
it never getting built (because it is too expensive)


Given how busy north and south london mainline railways are I'm not sure
crossrail 2 is viable from a service point of view. Perhaps they should
just
build the hackney tube instead.

--
Spud


From the SW there is plenty of capacity on the envisaged routes into
Wimbledon. Taking Crossrail2 services into tunnel from there will actually
relieve congestion on the really busy lines from there into Waterloo via
(especially) Clapham Junction.



  #5   Report Post  
Old June 11th 14, 01:18 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jun 2014
Posts: 1
Default New Crossrail 2 route

["Followup-To:" header set to uk.railway.]
On 2014-06-10, d wrote:
On Tue, 10 Jun 2014 17:29:39 +0200
"tim....." wrote:
"Recliner" wrote in message
...
Graeme Wall wrote:
http://www.bbc.co.uk/news/uk-england-london-27764476

There's already a thread in uk.t.l, with a link to this more detailed
consultation document:
https://consultations.tfl.gov.uk/crossrail/june-2014

whatever happened to the simple option of connecting Waterloo to KX?

This tunnel all the way from Wimbledon to Tottenham looks like a recipe for
it never getting built (because it is too expensive)


Given how busy north and south london mainline railways are I'm not sure
crossrail 2 is viable from a service point of view.


The line from Wimbeldon to Waterloo and platform space at Waterloo are
the main restriction on capacity further out. That's why the regional
proposal for XR2 (which seems to ahve now been adopted - the Metro
option appears to have been put up as a "pick any card, but not that
one") included tunneling out to Wimbeldon.


With bored tunnels, extra plain tunnel is a relatively small part of
the cost once you've got a TBM and all the supply chain sorted
out. Stations are very expensive, especially since they need to be
virtually all new becasue the existing central LU stations are mostly
at or very close to their safe capacity.

It seems that the ideal approach for the southern end would be to run
a bypass tunnel from near wimbeldon to Waterloo for the SWML (and
Portsmouth Direct etc.) long-distance trains, with the inners and
some of the outers running through the existing surface stations
before entering a cross-city tunnel outside Waterloo. Unfortunately,
that would either take unaceptably long or cause unacceptable loss of
capacity during construction.

Perhaps they should just build the hackney tube instead.


From what I've read on London Reconnections, it seems that TfL has a
policy of no new tubes: all new lines are to be built to main-line
loading gauge. That's for two reasons:

1) Capacity: there's so much supressed demand that any new line worth
building would fill up too quickly.
2) Safety regs: current regs
require a side walkway for new tunnels, and so the tunnel already
needs to be much larger than tube gauage.

Of course, they could build the Hackney tube to surface line
standards, but then what do you do to sort out Waterloo? Part of the
point of Thameslink, XR, etc. is to reduce the number of suburban
services terminating at the London termini, to get more efficent
useage of space.


  #6   Report Post  
Old June 11th 14, 05:48 PM
Senior Member
 
First recorded activity at LondonBanter: Feb 2011
Location: Leyton, East London
Posts: 902
Default

Quote:
Originally Posted by Philip Shaw View Post
From what I've read on London Reconnections, it seems that TfL has a
policy of no new tubes: all new lines are to be built to main-line
loading gauge. That's for two reasons:

1) Capacity: there's so much supressed demand that any new line worth
building would fill up too quickly.
I apologise if I'm being obtuse but why is that relevant to a tube line but not to
standard gauge line?
  #7   Report Post  
Old June 12th 14, 06:07 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Feb 2013
Posts: 704
Default New Crossrail 2 route

On 11 Jun 2014 13:18:35 GMT
Philip Shaw wrote:
From what I've read on London Reconnections, it seems that TfL has a
policy of no new tubes: all new lines are to be built to main-line
loading gauge. That's for two reasons:

1) Capacity: there's so much supressed demand that any new line worth
building would fill up too quickly.
2) Safety regs: current regs
require a side walkway for new tunnels, and so the tunnel already
needs to be much larger than tube gauage.


That all makes sense. But a self contained metro line is inherently more
reliable that one that relies on the vagueries of the main line railways at
either end. Look what happens to the ELL when it all goes pear shaped in
south london. If there's a balls up on the morgate and KX lines (which wasn't
uncommon when I used to use them) that'll be crossrail 2 stuffed unless
they're planning on giving it its own running lines at the side.

IMO a new "tube" line running S stock or whatever the equivalent would be by
then makes the most sense.

--
Spud



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Maps of the Olympic cycling route and marathon route Basil Jet London Transport 2 August 12th 09 07:00 PM
Bus Route 186 Grahame Park Re-Route?? [email protected] London Transport 6 August 5th 09 09:30 PM
Route 73 to go DD and Route 29 to go Bendi??? Martin Whelton London Transport 14 February 12th 05 10:07 AM
What is the Exact route of Crossrail between Canary Wharf & Customs House JohnP London Transport 0 July 20th 04 09:24 PM
Crossrail preferred route Angus Bryant London Transport 38 October 13th 03 08:36 PM


All times are GMT. The time now is 09:11 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017