London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #6   Report Post  
Old November 21st 14, 09:32 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2013
Posts: 152
Default Overground speed - or lack thereof

On Fri, 21 Nov 2014 22:19:04 +0000, Paul Corfield
wrote:

I think TfL schedule the Overground services fairly loosely with
recovery margins to ensure good time keeping. I agree that the service
can be / feels slow on the ELL core.


Is good time keeping along the route important? Instead of having
faster journeys when possible with more recovery time at the ends.

--
jhk
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Doh - lack of Overground mentality eastender[_4_] London Transport 2 November 25th 12 11:46 AM
New years day service - or lack thereof [email protected] London Transport 44 January 3rd 10 04:26 PM
London Overground - lack of engineering works information Mizter T London Transport 0 November 17th 07 06:45 AM
Lack of road markings in Kensington & Chelsea John Rowland London Transport 41 August 31st 04 02:27 AM
Thameslink ticket checks - or lack of! Henry Littleton London Transport 25 November 21st 03 09:03 PM


All times are GMT. The time now is 10:36 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017