Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#20
|
|||
|
|||
Underline?
wrote in message ... On Fri, 6 Feb 2015 19:45:21 -0000 "michael adams" wrote: So which word or words in the 12 word sentence from your own link " These plans were shelved at the outset of the Second World War," are you having the biggest difficulty with ? Eh? So there were plans before the war. Err, yeess. But then what happened ? Can you remember ? Or do you need a clue ? Hint: " These plans were shelved at the outset of the Second World War," http://underground-history.co.uk/shelters.php slowly Which means that they weren't first envisaged as shelters and then to be converted into a tube tunnel but the other way around. No. The way they were first envisaged was shelved. " These plans were shelved at the outset of the Second World War," Otherwise there would have been nothing to shelve, would there ? And then you'd have been correct ! But they were shelved. And so you're wrong. (See above) Which is my point. /slowly Which is obviouly wrong as those plans were shelved. Perhaps you should learn to follow a thread? All I need do is follow your own links - " These plans were shelved at the outset of the Second World War," michael adams .... |