London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old April 16th 15, 12:37 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2009
Posts: 240
Default Electoral registration (was: Croxley Rail Link go ahead confirmed)

In message , Roland Perry
wrote:
Whatever the check is (I think Enhanced CRB is an old one) there are
certainly checks like that done on Uni students who are volunteers. And
apparently are still not transferable, and have to be done over and
over again for every few hours volunteering.


You're out of date. According to what I've been told, any organization
can accept an existing DBS check rather than doing its own. Obviously it
needs to consider the risks in doing so, and needs to do the identity
check.

--
Clive D.W. Feather | Home:
Mobile: +44 7973 377646 | Web: http://www.davros.org
Please reply to the Reply-To address, which is:
  #2   Report Post  
Old April 16th 15, 07:04 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Electoral registration (was: Croxley Rail Link go ahead confirmed)

In message , at 01:37:13 on Thu, 16
Apr 2015, Clive D. W. Feather remarked:
Whatever the check is (I think Enhanced CRB is an old one) there are
certainly checks like that done on Uni students who are volunteers.
And apparently are still not transferable, and have to be done over
and over again for every few hours volunteering.


You're out of date. According to what I've been told, any organization
can accept an existing DBS check rather than doing its own. Obviously
it needs to consider the risks in doing so, and needs to do the
identity check.


Perhaps I identified the wrong failure mode. On second thoughts more
likely it's because at the application stage (to multiple organisations
for a summer of bits-and-pieces volunteering) the first DBS check hasn't
come through yet.
--
Roland Perry
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Post electoral blues - Bexley wants promises cashed Mwmbwls London Transport 2 May 19th 08 06:58 AM
Croxley Rail Link - Position Update October 2007 burkey London Transport 1 October 28th 07 07:58 PM
Croxley Rail Link Petition burkey London Transport 42 April 19th 07 07:57 PM
CROXLEY RAIL LINK - POSITION UPDATE - February 2007 burkey London Transport 4 March 6th 07 01:06 PM
Future is bleak for Croxley Rail Link JWBA68 London Transport 8 January 28th 04 12:53 PM


All times are GMT. The time now is 11:17 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017