Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On 2015\05\23 15:39, Mizter T wrote:
On 22/05/2015 19:37, Peter Smyth wrote: Basil Jet wrote: I just looked at the timetable for the Cheshunt/Chingford lines, http://www.tfl.gov.uk/cdn/static/cms...e-may-2015.pdf and during the repeating sections (all day Saturday and Sunday and bits on weekdays), there are 8 tph between Liverpool Street and Hackney Downs, with alternating 1 minute and 14 minute gaps in either direction at Hackney Downs! The problem is if you spread out the slow trains more evenly, they will get in the way of the fast trains to Stansted/Cambridge. Short of building extra tracks between Liverpool Street and Bethnal Green, I don't think there is any easy answer to this problem. Agreed. I don't agree. The fast trains have their own tracks from Hackney Downs to Bethnal Green. From BG to Liverpool Street they can either use the fast Shenfield tracks or interleave with the slow Hackneys, but either way I don't see there being no room for a slow Hackney every 7.5 minutes. Neither the fast line to Shenfield nor Hackney is that heavily used, is it? |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
New tube map, new London Connections, no timetables | London Transport | |||
New London Connections map is available | London Transport | |||
New take on London Connections map | London Transport | |||
JLE - anything they should have added at time of building? | London Transport | |||
New London Connections map... | London Transport |