Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On Mon, 29 Aug 2016 14:15:49 +0100, Basil Jet
wrote: On 2016\08\29 08:28, e27002 aurora wrote: Most stations on the GCGW joint route had four tracks between the platforms. Moreover, enough land was purchased to enable a four track route. Is the tunnel between Sudbury Hill Harrow and Northolt Park four-track? No. |
#2
![]() |
|||
|
|||
![]()
On Mon, 29 Aug 2016 14:23:23 +0100, e27002 aurora
wrote: On Mon, 29 Aug 2016 14:15:49 +0100, Basil Jet wrote: On 2016\08\29 08:28, e27002 aurora wrote: Most stations on the GCGW joint route had four tracks between the platforms. Moreover, enough land was purchased to enable a four track route. Is the tunnel between Sudbury Hill Harrow and Northolt Park four-track? No. And it is cuit-and-cover so very difficult to do anything with. Guy Gorton |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Reduction in Chiltern Services and Funding of Shared Met Line | London Transport | |||
Oyster card help line - why so crap? | London Transport | |||
Google crap | London Transport | |||
Chiltern Services Between Amersham & Harrow | London Transport | |||
Britains Crap Roads, Answers wanted | London Transport |