Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#11
![]() |
|||
|
|||
![]()
wrote:
On Mon, 13 Feb 2017 16:29:45 +0000 David Walters wrote: On Mon, 13 Feb 2017 16:04:48 +0000 (UTC), d wrote: On Mon, 13 Feb 2017 08:15:01 -0600 And 378s won't be used on GOBLIN either. Are they planning on buying a whole new set of EMUs just for the goblin then? I find that hard to believe. TfL are buying 45 four-car 710s for use on the West Anglia Routes and the Watford DC, GOBLIN and Romford to Upminster lines I should have guessed. Another pointless new EMU design costing extra when there's already perfectly servicable one in the 378. I guess shiny new toys are more important than saving money and having interoperability with existing equipment when its someone elses money you're spending. By that impeccable logic, they should have ordered some new-build 313s, not shiny new 378s. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Network Rail "incorrectly designed" the Gospel Oak - | London Transport | |||
Network Rail "incorrectly designed" the Gospel Oak - | London Transport | |||
Gospel Oak-Barking | London Transport | |||
SPECS installation in Gospel Oak? | London Transport | |||
Gospel Oak - Barking | London Transport |