Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#18
![]() |
|||
|
|||
![]()
On Wed, 15 Feb 2017 10:26:31 -0000 (UTC)
Recliner wrote: wrote: On Wed, 15 Feb 2017 09:48:06 -0000 (UTC) Recliner wrote: wrote: On Tue, 14 Feb 2017 16:42:55 -0000 (UTC) Recliner wrote: wrote: On Tue, 14 Feb 2017 16:07:14 -0000 (UTC) Recliner wrote: wrote: The DC line is mostly 6-carriage platforms. I'm sure if TfL/Bombardier got stephen hawking and some rocket scientists on a retainer they could after some serious brainstorming sessions figure out a way to build a 6 car 378. Oi, pay attention, the naughty boy at the back! As already mentioned in this thread and others, the DC line will be getting new 4-car Aventras to replace the 5-car 378s. So, far from any rocket scientists, it won't even need any retards like you to figure out a way to build 6-car 378s. There won't be any more 378s built. So you're answer to why they're not using 378s on the goblin is because they're not. Please translate that into English? Sorry, I was trying to comprehend your tortured logic. Clearly I failed probably because there wasn't any to start with. I realise English isn't your native language, but I wonder if your translator generated "you're" instead of "your" in that garbled sentence? Perhaps you're using obsolete software to translate what passes for your thoughts into English? Awww, have you really had to fall back on pointing out typos? Never mind, don't get upset, you'll think up a proper counterpoint again one day! They're not typos. They're illiteracy. Your translation software needs upgrading. You're on thin ice here since I'm damn sure if I searched back through all your posts I could find some typos but I have better things to do with my life. If you're idea of a riposte is typo spotting then knock yourself out but you're simply coming across as desperate. When its a continuation of a previous order that rule generally doesn't apply which is how they managed to build all those extra cars to extend the ELL trains to 5 cars. It's not a continuation of an existing order. If TfL had had any forsight it could easily have been. -- Spud |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Network Rail "incorrectly designed" the Gospel Oak - | London Transport | |||
Network Rail "incorrectly designed" the Gospel Oak - | London Transport | |||
Gospel Oak-Barking | London Transport | |||
SPECS installation in Gospel Oak? | London Transport | |||
Gospel Oak - Barking | London Transport |