London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #24   Report Post  
Old February 16th 17, 10:57 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default Network Rail "incorrectly designed" the Gospel Oak - Barking

On Wed, 15 Feb 2017 20:28:39 +0000, Basil Jet
wrote:

On 2017\02\15 13:54, d wrote:
On Wed, 15 Feb 2017 10:26:31 -0000 (UTC)
Recliner wrote:

It's not a continuation of an existing order.


If TfL had had any forsight it could easily have been.


Were the TfL takeover of the West Anglia lines and the electrification
of the Goblin even on the cards when the 378s were ordered?


No
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Network Rail "incorrectly designed" the Gospel Oak - [email protected] London Transport 1 February 15th 17 11:48 AM
Network Rail "incorrectly designed" the Gospel Oak - [email protected] London Transport 1 February 11th 17 11:14 PM
Gospel Oak-Barking Andrea London Transport 16 March 8th 07 07:37 PM
SPECS installation in Gospel Oak? John Rowland London Transport 1 April 15th 06 09:52 AM
Gospel Oak - Barking Slim London Transport 1 July 21st 04 12:26 PM


All times are GMT. The time now is 04:45 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017