Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#24
![]() |
|||
|
|||
![]()
On Wed, 15 Feb 2017 20:28:39 +0000, Basil Jet
wrote: On 2017\02\15 13:54, d wrote: On Wed, 15 Feb 2017 10:26:31 -0000 (UTC) Recliner wrote: It's not a continuation of an existing order. If TfL had had any forsight it could easily have been. Were the TfL takeover of the West Anglia lines and the electrification of the Goblin even on the cards when the 378s were ordered? No |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Network Rail "incorrectly designed" the Gospel Oak - | London Transport | |||
Network Rail "incorrectly designed" the Gospel Oak - | London Transport | |||
Gospel Oak-Barking | London Transport | |||
SPECS installation in Gospel Oak? | London Transport | |||
Gospel Oak - Barking | London Transport |