Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#19
![]() |
|||
|
|||
![]()
On Thu, 16 Feb 2017 21:17:47 -0000 (UTC)
Recliner wrote: David C wrote: I don't want to join your slanging match, but the dual-system 710/2 units are going to be maintained at the exisitng depot at Willesden. Makes sense to me........., 'tis on the Watford line & only a short hop from Gospel Oak, + it's what they do now........... Yes, I know. But I was wondering if Spud did. It seems not. No surprise there. And of course the Liverpool St 710s will be maintained at the existing Ilford depot. Looks like both are getting very expensive upgrades. I'm sure thats pure coincidence however. -- Spud |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Network Rail "incorrectly designed" the Gospel Oak - | London Transport | |||
Network Rail "incorrectly designed" the Gospel Oak - | London Transport | |||
Gospel Oak-Barking | London Transport | |||
SPECS installation in Gospel Oak? | London Transport | |||
Gospel Oak - Barking | London Transport |