London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old February 12th 17, 01:01 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default Barbican Thameslink service

In article
-septembe
r.org, (Recliner) wrote:

wrote:
In article
-
september.org,
(Recliner) wrote:

wrote:
In article
-
september.org,
(Recliner) wrote:

Charles Ellson wrote:
On Thu, 9 Feb 2017 09:29:09 +0000 (UTC),
d wrote:

On Thu, 9 Feb 2017 07:48:39 +0000
Basil Jet wrote:
Does anyone know when Barbican ceased to be served by Thameslink
trains FROM Moorgate? All of the web resources suggest that
Barbican was served by Thameslink trains in both directions until
2009, but I know that platform 4 was out of use for at least a
decade before the junction at Farringdon closed.

Sounds reasonable. I used to use the circle line about 15 years ago
and P4 was out of use even then.

On a related note, does anyone know the fate of that branch? Are LU
still going to take it over and use it for sidings when crossrail
is done, or has that fallen by the wayside?

Some has been built over, some is used for storage and ISTR might be
used for additional sidings.

Seen on Twitter today -- new LU sidings being built at Farringdon:

Track renewals at Farringdon - first phase installation of a new
modular double junction and sidings roads

https://pbs.twimg.com/media/C4YhuGaWIAA6BE9?format=jpg&name=large

Replacing earlier sidings which were taken up because they were too
short, surely?

Yes, I think so. Presumably there's now room for longer ones, with the
WL tracks gone.


Presumably but it's not clear to me from the angle of the shot
where the sidings will end up.


More pics:
https://pbs.twimg.com/media/C4ZxRUeX...jpg&name=large


Is that Farringdon in the background of the first two of those pictures?

--
Colin Rosenstiel

  #2   Report Post  
Old February 12th 17, 01:06 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default Barbican Thameslink service

wrote:
In article
-septembe
r.org, (Recliner) wrote:

wrote:
In article
-
september.org,
(Recliner) wrote:

wrote:
In article
-
september.org,
(Recliner) wrote:

Charles Ellson wrote:
On Thu, 9 Feb 2017 09:29:09 +0000 (UTC),
d wrote:

On Thu, 9 Feb 2017 07:48:39 +0000
Basil Jet wrote:
Does anyone know when Barbican ceased to be served by Thameslink
trains FROM Moorgate? All of the web resources suggest that
Barbican was served by Thameslink trains in both directions until
2009, but I know that platform 4 was out of use for at least a
decade before the junction at Farringdon closed.

Sounds reasonable. I used to use the circle line about 15 years ago
and P4 was out of use even then.

On a related note, does anyone know the fate of that branch? Are LU
still going to take it over and use it for sidings when crossrail
is done, or has that fallen by the wayside?

Some has been built over, some is used for storage and ISTR might be
used for additional sidings.

Seen on Twitter today -- new LU sidings being built at Farringdon:

Track renewals at Farringdon - first phase installation of a new
modular double junction and sidings roads

https://pbs.twimg.com/media/C4YhuGaWIAA6BE9?format=jpg&name=large

Replacing earlier sidings which were taken up because they were too
short, surely?

Yes, I think so. Presumably there's now room for longer ones, with the
WL tracks gone.

Presumably but it's not clear to me from the angle of the shot
where the sidings will end up.


More pics:
https://pbs.twimg.com/media/C4ZxRUeX...jpg&name=large


Is that Farringdon in the background of the first two of those pictures?


Yes, that's where this weekend's work is. I don't think LU has any use for
the CWL formation for its tracks east of that area. Any of the former track
bed not needed by Crossrail will no doubt find a commercial use between
Barbican and Moorgate.

  #3   Report Post  
Old February 13th 17, 09:26 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2015
Posts: 1,044
Default Barbican Thameslink service

On Sun, 12 Feb 2017 02:06:57 -0000 (UTC)
Recliner wrote:
wrote:
Is that Farringdon in the background of the first two of those pictures?


Yes, that's where this weekend's work is. I don't think LU has any use for
the CWL formation for its tracks east of that area. Any of the former track
bed not needed by Crossrail will no doubt find a commercial use between
Barbican and Moorgate.


That seems a bit shortsighted IMO. There's always a use for a new diversion
line, stabling and reversing facilities for when the circle craps out again.

--
Spud

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Barbican Thameslink service [email protected] London Transport 1 February 12th 17 12:40 AM
Barbican Thameslink service [email protected] London Transport 1 February 11th 17 09:38 PM
Barbican Thameslink service Basil Jet[_4_] London Transport 5 February 11th 17 03:24 PM
Barbican station closure? Someone Somewhere London Transport 5 August 5th 16 07:08 PM
Official vandalism at Barbican Jack Taylor London Transport 12 February 25th 08 10:08 AM


All times are GMT. The time now is 07:56 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017