London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #15   Report Post  
Old May 31st 17, 07:47 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2015
Posts: 58
Default Crossrail 2 hits the buffers

On Wed, 31 May 2017 13:45:22 +0100, "tim..."
wrote:

as the bottleneck on the mainline runs all the way back to new Malden, where
are the extra paths on that part going to come from to achieve that?


I think the plan was to add a 5th track from the tunnel portal to at
least New Malden... Perhaps Hampton Court Junction.

Richard.


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Bus hits tree Boltar London Transport 35 May 21st 08 05:53 PM
Croxley Rail Link hits the sidings [email protected] London Transport 61 April 8th 08 03:21 PM
Congestion charging hits the rails Rupert Candy London Transport 8 June 23rd 05 08:56 PM
South Ken redevelopment hits buffers Dave Arquati London Transport 3 September 12th 04 04:22 AM
Tall ship hits Tower Bridge Richard J. London Transport 22 May 18th 04 12:57 AM


All times are GMT. The time now is 03:32 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017