London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #10   Report Post  
Old August 14th 17, 08:42 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default Crossrail 2 funding row

Roland Perry wrote:
In message
-sept
ember.org, at 07:45:44 on Mon, 14 Aug 2017, Recliner
remarked:

Is HS2 feasible without CR2?


Yes.

HS2 phases 1 and 2a are scheduled to open long before CR2 could be
completed, so CR2 isn't relevant to them. Passengers arriving at Euston
will, as now, have direct connections to both Northern line branches
(hopefully benefiting from a much higher frequency than today), the
Victoria line,


We can hope for the latter. Unfortunately the Victoria Line is saturated
there, southbound trains in the peaks having left Kings Cross with no
room at all.


True, but I suppose that HS2 pax will tend to arrive after the busiest
time.


and an improved link to the Met, Circle and H&C at Euston
Square.


That might be kite flown at an early stage, but the whole Euston design
is still in a state of flux (and *already* running at least 7yrs late).

iirc the link to Euston Square was *via* the CR2 station, and as with
most such modern links would involve a considerable amount of walking.


A lot less than today. Basically, they have to add a new connection to the
eastern end of the Euston Square platforms, which will be very close to the
HS2 platforms and concourse.

The SSR services should also be more frequent and reliable than today, with
the new signalling in place. I think that includes ATO.


The vapourware travelator/people-mover from Euston to Kings Cross St
Pancras has already been scrapped, I think; so the subsurface lines have
even more to cope with.


Yes




 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Crossrail funding Mr Thant London Transport 0 December 4th 08 11:54 PM
BBC - Crossrail gets £230m BAA funding Mizter T London Transport 2 November 7th 08 03:10 PM
Row over platform width delays Sandhills station reopening. Mizter T London Transport 6 February 22nd 08 06:59 PM
News - Safety Row Joe London Transport 21 November 15th 03 05:21 PM
Crossrail funding approved Matthew Malthouse London Transport 25 July 27th 03 12:02 PM


All times are GMT. The time now is 10:10 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017