London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old February 6th 18, 10:20 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Sep 2014
Posts: 1,385
Default Brent Cross West (Thameslink) station opening brought forward from2031 to 2022


The railway press seems to have missed this completely.

https://www.barnet.gov.uk/citizen-ho...hameslink.html

Four platforms - when was the last time a new station opened with four
platforms? I think Cambridge North only has three. I'm guessing Luton
Airport Parkway, and before that God knows when there was another.

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
The Hendon Lines and Brent West Curve Robin9 London Transport 7 October 30th 17 02:13 PM
NLL work brought forward - DfT Paul Scott London Transport 4 November 26th 08 12:08 PM
Brent Cross Light Rail Mwmbwls London Transport 37 February 7th 08 03:38 AM
Wood Green to Brent Cross Kev London Transport 8 August 12th 07 12:11 AM
BRENT CROSS CAR PARKING info needed Jo London Transport 4 April 27th 04 09:21 AM


All times are GMT. The time now is 07:32 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017