Signal failure at Victoria
 
Roland Perry wrote:
In message , at 13:01:35 on Fri, 6 Jul 2018,
Anna Noyd-Dryver remarked:
Right, here’s some Actual Facts copied from another forum.

quote
As I understand it, it was loss of all signalling power to Streatham
Junction Remote Interlocking area. Ex-Southern Region area signalling
installations usually have three seperate incoming power supply sources,
but in this case there was a catastrophic failure of a part of common
equipment. Other sources state that NR has had to bypass the equipment in
hard wiring to get it working again, but before it could do that it first
had to determine what had caused the original failure, and also monitor the
temporary setup to make sure a hidden fault didn't reoccur and cause even
more damage.


I wonder what it was - they'd have pretty quickly been able to eliminate
back-hoes, smoking substations, and National Grid technicians with
finger trouble.


From the end of my post:

“Signal power feed triple redundant 3 input BUT the changeover swiitch
(single point of failure) was what burnt out”

Apparently the incident is subject to a formal inquiry which will report
back to the NR Board and the DfT.

Edit to add: This just in from GTR journeycheck:

“The electrical supply that maintains this areas signalling system failed.
The failure has been traced to a faulty power supply cable which feeds off
the national grid.”

Well, that must of given the changeover switchgear a good bang
/quote

And from another post in the same place:

“Signal power feed triple redundant 3 input BUT the changeover swiitch
(single point of failure) was what burnt out”

That confirms everything I was saying about the cause, thanks.

It appears to differ from Network Rail's originally announced quick-fix
of generators, unless that's what they used ahead of working out it was
safe to hard-wire one of the two remaining grid feeds.

Thus they still have quite a big project ahead of them - reinstating the
three-way failover equipment (as well as the grid having to make 3/3
rather than 2/3 of the supplies operational).


It also confirms that it’s local equipment, not at the signalling centre
itself.


"A generator has been sourced to isolate the power feed and is
expected to arrive at the signalling centre later this morning.
Once the generator arrives, the situation will be re-assessed."

So it's just a co-incidence that the signalling centre still had power,
yet they needed to locate a generator there to re-energise the local
equipment?


Or that you/we are being over-specific about the terminology used in a
statement that’s probably third-hand when it gets published by someone
who’s not technical staff; and the generator is actually at the site in
Streatham where the problem seems to have occurred, rather than at Three
Bridges ROC which controls the area.


Anna Noyd-Dryver


Roland Perry July 6th 18 03:05 PM

Signal failure at Victoria
 
In message , at 14:33:57 on Fri, 6 Jul 2018,
Anna Noyd-Dryver remarked:
Roland Perry wrote:
In message , at 13:01:35 on Fri, 6 Jul 2018,
Anna Noyd-Dryver remarked:
Right, here’s some Actual Facts copied from another forum.

quote
As I understand it, it was loss of all signalling power to Streatham
Junction Remote Interlocking area. Ex-Southern Region area signalling
installations usually have three seperate incoming power supply sources,
but in this case there was a catastrophic failure of a part of common
equipment. Other sources state that NR has had to bypass the equipment in
hard wiring to get it working again, but before it could do that it first
had to determine what had caused the original failure, and also
monitor the
temporary setup to make sure a hidden fault didn't reoccur and cause even
more damage.


I wonder what it was - they'd have pretty quickly been able to eliminate
back-hoes, smoking substations, and National Grid technicians with
finger trouble.


From the end of my post:

“Signal power feed triple redundant 3 input BUT the changeover swiitch
(single point of failure) was what burnt out”


I meant - what caused it to burn out? Just old age, or was it my
suggestion that when one of the grid feeds failed for a random reason
(they do, which is why one has three) the subsequent load via two of the
contacts on the contact breakers was too high?

Apparently the incident is subject to a formal inquiry which will report
back to the NR Board and the DfT.

Edit to add: This just in from GTR journeycheck:

“The electrical supply that maintains this areas signalling
system failed.
The failure has been traced to a faulty power supply cable which feeds off
the national grid.”

Well, that must of given the changeover switchgear a good bang
/quote

And from another post in the same place:

“Signal power feed triple redundant 3 input BUT the changeover swiitch
(single point of failure) was what burnt out”

That confirms everything I was saying about the cause, thanks.

It appears to differ from Network Rail's originally announced quick-fix
of generators, unless that's what they used ahead of working out it was
safe to hard-wire one of the two remaining grid feeds.

Thus they still have quite a big project ahead of them - reinstating the
three-way failover equipment (as well as the grid having to make 3/3
rather than 2/3 of the supplies operational).

It also confirms that it’s local equipment, not at the signalling centre
itself.


"A generator has been sourced to isolate the power feed and is
expected to arrive at the signalling centre later this morning.
Once the generator arrives, the situation will be re-assessed."

So it's just a co-incidence that the signalling centre still had power,
yet they needed to locate a generator there to re-energise the local
equipment?


Or that you/we are being over-specific about the terminology used in a
statement that’s probably third-hand when it gets published by someone
who’s not technical staff; and the generator is actually at the site in
Streatham where the problem seems to have occurred, rather than at Three
Bridges ROC which controls the area.


Perhaps it's a case of over-reading "signalling centre" to mean "ROC",
when what they mean is a portacabin on the trackside somewhere in
Stretham.

ps Kudos for being the first person to note the ROC isn't in Stretham.
--
Roland Perry

Sam Wilson July 6th 18 03:25 PM

Signal failure at Victoria
 
On 2018-07-06 15:05:43 +0000, Roland Perry said:

In message , at 14:33:57 on Fri, 6 Jul
2018, Anna Noyd-Dryver remarked:
Roland Perry wrote:
In message , at 13:01:35 on Fri, 6 Jul 2018,
Anna Noyd-Dryver remarked:
Right, here’s some Actual Facts copied from another forum.

quote
As I understand it, it was loss of all signalling power to Streatham
Junction Remote Interlocking area. Ex-Southern Region area signalling
installations usually have three seperate incoming power supply sources,
but in this case there was a catastrophic failure of a part of common
equipment. Other sources state that NR has had to bypass the equipment in
hard wiring to get it working again, but before it could do that it first
had to determine what had caused the original failure, and also monitor the
temporary setup to make sure a hidden fault didn't reoccur and cause even
more damage.

I wonder what it was - they'd have pretty quickly been able to eliminate
back-hoes, smoking substations, and National Grid technicians with
finger trouble.


From the end of my post:

“Signal power feed triple redundant 3 input BUT the changeover swiitch
(single point of failure) was what burnt out”


I meant - what caused it to burn out? Just old age, or was it my
suggestion that when one of the grid feeds failed for a random reason
(they do, which is why one has three) the subsequent load via two of
the contacts on the contact breakers was too high?


We had an incident not long ago during an electrical refurbishment
where, IIRC, the main switch "fell apart". It took several days for a
replacement to be sourced from abroad (Germany, I think) and during
that time a major site ran on generators (parts of it didn't run at all
for some of the time).

Sam

--
The University of Edinburgh is a charitable body, registered in
Scotland, with registration number SC005336.



All times are GMT. The time now is 09:54 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright 2004-2006 LondonBanter.co.uk