Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#2
![]() |
|||
|
|||
![]()
In message , at
20:26:17 on Thu, 23 Aug 2018, Ding Bat remarked: ATO (Automated Train Operation) on Thameslink Three buttons sit on the driver's panel of Thameslink's Class 700 trains. After a brief stop Interesting that they have to stop. Perhaps that's why the timing for that leg of the journey is so relaxed. Ironic that "speeding up" the trains necessitates stopping them! in a new tunnel between Kings Cross and St Pancras, the driver of the 09:46 from Peterborough to Horsham presses the middle yellow button and the train starts to drive itself. The journey was the first on the UK's mainline rail network to use an automated driving mode and sets the scene for thousands of partly automated journeys in 2019. https://www.wired.co.uk/article/tham...tfl-city-govia I note: The new tunnel is between Finsbury Park and St Pancras, not between Kings Cross and St Pancras I'm prepared to give them that, because no-one will have heard of Belle Isle, and it's far closer to Kings Cross than Finsbury Park, and in effect part of the KGX extended station throat, south of the NLL. I do think they need to carefully consider the date for 24tph though, which they probably want us to forget was originally December 20*18*. Earlier this year, before "meltdown Monday" the train companies were already saying that the 24tph would need to be phased in (rather than delivered in one go in Dec18), with additional steps in May19 and Dec19. *Then* came the meltdown, and later the agreement to scrap all of the December 2018 timetable change. Thus those pre-meltdown plans to have three phases in Dec18/May19/Dec19 would need to be *reduced* back to two phases, which sounds a bit, err, courageous. Meanwhile, there's the Kings Cross Throat project in "Spring" 2020, which would go a lot better if the final Cambridge trains weren't still using the station, and is needed for LNER to be able to deliver improved services in Dec20. However, they could arrange for at least both the Cambridge stoppers to have been switched to through-running (along with one Brighton train) by Dec19. Then add the second [new] Brighton train later. -- Roland Perry |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Thameslink ATO Specification published | London Transport | |||
Jubilee ATO | London Transport | |||
How can you have a signal failure on an ATO system? | London Transport |