On Wed, 16 Jan 2019 12:34:26 -0000 (UTC)
Recliner wrote:
Roland Perry wrote:
In message , at 10:18:52 on Wed, 16 Jan
2019, Neil J Robertson remarked:

Unlike cars trains are build to order. It would have been
fairly simple for Bombadier to build some more 378s


Not if you've thrown away the jigs, and/or there are compliance issues
with a new build of an old design.


And, of course, the 378s do not share a platform with the S stock. Neil is
wrong, as usual.


Same traction and control system which is the important part. The bodyshells
are all built to order anyway.

I notice you never point our when you're wrong which is pretty often.
Still think ordering the 710s was a great idea?


  #4   Report Post  
Old January 20th 19, 10:22 AM
Senior Member
 
First recorded activity at LondonBanter: Feb 2011
Location: Leyton, East London
Posts: 902
Default

The issue is not if it was right to order the 710s. It's whether
TfL should have allowed for a delay preventing their being
in use by December, 2019.
  #5   Report Post  
Old January 20th 19, 04:53 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jan 2019
Posts: 1
Default What news on the Goblin 710s?

On Sun, 20 Jan 2019 10:22:07 +0000
Robin9 wrote:
The issue is not if it was right to order the 710s. It's whether
TfL should have allowed for a delay preventing their being
in use by December, 2019.


Well they've never been blessed with foresight and they've
painted themselves into a tight corner. If they can't find
some spare 378s then it looks like it'll be a bustitute
until the 710s turn up - whenever that will be. If the delays
are as stated purely down to software issues then I'd venture
these issues are pretty intractable since they should have had an
off the shelf solution ready to go, its not exactly bleeding edge
tech.



  #6   Report Post  
Old January 20th 19, 05:08 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default What news on the Goblin 710s?

wrote:
On Sun, 20 Jan 2019 10:22:07 +0000
Robin9 wrote:
The issue is not if it was right to order the 710s. It's whether
TfL should have allowed for a delay preventing their being
in use by December, 2019.


Well they've never been blessed with foresight and they've
painted themselves into a tight corner. If they can't find
some spare 378s then it looks like it'll be a bustitute
until the 710s turn up - whenever that will be. If the delays
are as stated purely down to software issues then I'd venture
these issues are pretty intractable since they should have had an
off the shelf solution ready to go, its not exactly bleeding edge
tech.



And which software, exactly, have you reviewed and characterised as 'not
exactly bleeding edge'?

  #7   Report Post  
Old January 21st 19, 12:12 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jan 2019
Posts: 1
Default What news on the Goblin 710s?

On Sun, 20 Jan 2019 17:08:57 -0000 (UTC)
Recliner wrote:
wrote:
On Sun, 20 Jan 2019 10:22:07 +0000
Robin9 wrote:
The issue is not if it was right to order the 710s. It's whether
TfL should have allowed for a delay preventing their being
in use by December, 2019.


Well they've never been blessed with foresight and they've
painted themselves into a tight corner. If they can't find
some spare 378s then it looks like it'll be a bustitute
until the 710s turn up - whenever that will be. If the delays
are as stated purely down to software issues then I'd venture
these issues are pretty intractable since they should have had an
off the shelf solution ready to go, its not exactly bleeding edge
tech.



And which software, exactly, have you reviewed and characterised as 'not
exactly bleeding edge'?


Train software. Its not stealth radar or a spacecraft control system they're
trying to get working. It moves in 1 dimension on a track and moving block
signalling and IGBT train control systems are a solved problem and should be
off the shelf packages from their suppliers. If Bombadier have been dumb enough
to write everything from scratch then more fool them and someone should get
their P45.



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
GOBLIN - Saturday 15th August Phil Richards London Transport 2 August 18th 09 05:41 PM
Lack of GOBLin connections [email protected] London Transport 46 December 1st 07 04:44 PM
GOBLIN ticket offices? Brian Watson London Transport 0 November 2nd 07 06:05 PM
GOBLIN station staffing Chris Read London Transport 12 September 13th 07 12:25 AM
GOBLIN upgrade TIF finance announced Bob London Transport 5 July 27th 07 12:41 PM


All times are GMT. The time now is 09:13 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017