London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #24   Report Post  
Old November 12th 04, 04:49 PM posted to uk.railway,uk.transport.london,misc.transport.rail.europe
external usenet poster
 
First recorded activity at LondonBanter: Aug 2004
Posts: 22
Default Dangers of High Speed Trains Pushed from the Rear

On Wed, 10 Nov 2004 18:10:58 UTC, David Hansen
wrote:

: The forces the power cars produce are minor compared
: to the forces involved in a crash.

3000hp at 100mph is pretty close to 5 tons of thrust. As David says,
compared to the crash forces on half a train (4 * 35 ton coaches + 1 *
70 ton locomotive = 210 tons), that's trivial.

Ian

--

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
The dangers of the subways of Elephant & Castle... Mizter T London Transport 8 August 2nd 14 07:50 AM
South Eastern expand High Speed Service plcd1 London Transport 7 August 18th 09 02:58 PM
High speed line routeing 1506 London Transport 0 April 17th 09 04:49 PM
LCR plans high-speed line to north TravelBot London Transport News 0 August 28th 06 08:24 AM
Wood Green High Road speed limit John Rowland London Transport 4 September 18th 05 11:34 PM


All times are GMT. The time now is 07:30 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017