Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#10
![]() |
|||
|
|||
![]()
downunder wrote:
Investigations have shown no structural damage to either Circle/H&S roof/sidewalls. There is supeficial damage to cabling and the immediate areas but this will not take too long to fix. The Picc is a different story. However its possible the Vic line will be resume stopping at Kings Cross later today. This will allow interchange with Met and mainline/Thameslink. Northern still being assesed. What has prevented the Vic line opening so far? Obviously there is still investigation and recovery work going on in the picc line section, but what is it that passengers from the vic line need to be shielded from? |