London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old October 8th 05, 05:47 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Apr 2005
Posts: 95
Default how difficult/expensive would it be to re-create a Malta railway?


wrote in message
oups.com...




Harbour Line (Valletta,Marsa,Cospicua,Zabbar,Marsascala)
Old Line (Valletta,hamrun,Bkara,Qormi,Attard,Zebbug,Rabat,M dina)
University Line (Msida,University,Hospital, Birkirkara,Mosta )


These would appear to be about 2 Km apart.

Does Mdina even get the traffic? When I was in Malta it
had significantly less buses than other destinations.

Sliema Line (Valletta,Sliema, St Julians)


Is there an overground route for this. It is pretty built up.
OTOH it migh be possible to build as a submersed tunnel
along the coast-line. That could be fun!

i dont know if it would be cost effective to include the far
nothern/southern (20 km away) tips of the island. apart from certain
holidays they are not badly affected by traffic at all.


Do you mean Salina/Bugibba. ISTM that this is an area that
can generate substantial passanger traffic. Even if it isn't so
congested by road traffic it is likely to show a better cost
benefit than a line terminating in Mosta.

are running/maintenance costs mainly linked to distance or number of
stops?

i think connecting gozo would be comparable in complexity to the
channel tunnel.


Agreed. Gozo is out of the question.

So far these are what will be needed so far

trains 4 short trains (3 cars) x 2 for both directions + 4 backup
trains


This is one train every 30-40 minutes?
Looking at the frequency of the buses, this isn't enough.

laying track 100km x both directions


This seems too much:
1) for only 20 stations.
2) Separate lines 2 Km apart is not cost effective.
Build one line which splits if you must serve Mdina.
3) with only one train per direction on each line, why are you
building full length double track?

leveling ground 50km
spanning bridges 2km
tunnels 10km
1 train yard
1 train HQ
20 stations


This is not enough. It is a waste of the rest of the infrastructure
and stations 5 Km apart cannot replace a bus service.

Are you not going to serve the airport?

tim



 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Which railway line would you like to see re-opened if money wasno object? E27002 London Transport 1 May 4th 10 01:32 AM
Malta Bus in Ilford Axlegrease London Transport 4 November 4th 05 05:52 PM
how expensive would it be to create a Malta urban railway? [email protected] London Transport 17 October 10th 05 01:43 PM
If you think parking's difficult in London... Rupert Goodwins London Transport 0 September 2nd 03 10:01 PM


All times are GMT. The time now is 02:30 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017