Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#16
![]() |
|||
|
|||
![]()
nRoland Perry typed:
In message , at 21:33:43 on Mon, 28 Nov 2005, Richard J. remarked: So there is the possibility of stretches of 599m of lit road where the limit is still NSL, without any repeaters being required. But the guidelines do say that for lit stretches of 600m or more, the first and last repeaters should be not more than 450m from the start/end of the lit section, so it would be reasonable to expect at least one repeater in a lit section of more than 450m. Yes, if the lit section is more than 600m. Especially if you are new to the area, you may not know how far the lights go. No, what I mean is that it would be reasonable to apply the "first repeater within 450m" rule for lit sections of between 450 and 600m as well as for those of 600m. However, the guidance is poor in my view. I much prefer the French practice of often putting several repeater signs close together just after the start of the limit, which leaves you in no doubt what the limit is. In Britain, if you miss the initial sign, Which initial sign is that? We are mainly talking about isolated stretches of lit road (whether they be thorough a village, or merely adjacent to a junction) where there's no sign at the start of the lit section. In which case the previous limit still applies. Where the limit changes, they should sign it properly, and it stays in force until the next limit change. If there's likely to be any doubt, put in extra repeaters as necessary. But all this stuff about street lights and whether they are close enough together is not helpful. (I mean the DfT rules are unhelpful, not your discussion of them.) It's led to ludicrous rules like it being illegal to put up 30mph repeaters in a lit street unless there is a speed camera within 1km. -- Richard J. (to e-mail me, swap uk and yon in address) |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Time limit for Oyster PayG journey | London Transport | |||
Wood Green High Road speed limit | London Transport | |||
A13: Why the new speed limit? | London Transport | |||
Minimum speed limit sign after the dartford tunnel? | London Transport |