Dave Arquati April 8th 06 10:45 AM

District line Wimbleware closure
 
The District line is closed from HSK to Edgware Road this weekend (as it
was last weekend), along with the usual SSL closures from Baker St to
Liverpool Street. However, the Circle is still running to Baker Street
from HSK. Is this because they've decided they can't turn around the
Wimblewares at Edgware Road as well as the H&Cs? They seem to have
managed OK before.


--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London

Colin Rosenstiel April 8th 06 01:05 PM

District line Wimbleware closure
 
In article , (Dave
Arquati) wrote:

The District line is closed from HSK to Edgware Road this weekend (as
it was last weekend), along with the usual SSL closures from Baker St
to Liverpool Street. However, the Circle is still running to Baker
Street from HSK. Is this because they've decided they can't turn
around the Wimblewares at Edgware Road as well as the H&Cs? They seem
to have managed OK before.


I guessed it must have been the enhanced volume of H&C reversals. Have
they had the entire Hammersmith service reversing at Edgware Road
alongside the District services before?

--
Colin Rosenstiel

Dave Arquati April 8th 06 01:57 PM

District line Wimbleware closure
 
Colin Rosenstiel wrote:
In article , (Dave
Arquati) wrote:

The District line is closed from HSK to Edgware Road this weekend (as
it was last weekend), along with the usual SSL closures from Baker St
to Liverpool Street. However, the Circle is still running to Baker
Street from HSK. Is this because they've decided they can't turn
around the Wimblewares at Edgware Road as well as the H&Cs? They seem
to have managed OK before.


I guessed it must have been the enhanced volume of H&C reversals. Have
they had the entire Hammersmith service reversing at Edgware Road
alongside the District services before?


They reduce the frequency from 8tph to 6tph (but they seem to be doing
that this weeked too, as well as during all the other closures when the
District was still running).

--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London

Robin Mayes April 8th 06 05:17 PM

District line Wimbleware closure
 

"Colin Rosenstiel" wrote in message
...
In article , (Dave
Arquati) wrote:

The District line is closed from HSK to Edgware Road this weekend (as
it was last weekend), along with the usual SSL closures from Baker St
to Liverpool Street. However, the Circle is still running to Baker
Street from HSK. Is this because they've decided they can't turn
around the Wimblewares at Edgware Road as well as the H&Cs? They seem
to have managed OK before.


I guessed it must have been the enhanced volume of H&C reversals. Have
they had the entire Hammersmith service reversing at Edgware Road
alongside the District services before?


The Circles are only running as far as Edgware Road this weekend as the
engineering work this weekend is track replacement at Baker Street, rather
than the "usual" CTRL works at Kings Cross.



Dave Arquati April 8th 06 05:49 PM

District line Wimbleware closure
 
Robin Mayes wrote:
"Colin Rosenstiel" wrote in message
...
In article , (Dave
Arquati) wrote:

The District line is closed from HSK to Edgware Road this weekend (as
it was last weekend), along with the usual SSL closures from Baker St
to Liverpool Street. However, the Circle is still running to Baker
Street from HSK. Is this because they've decided they can't turn
around the Wimblewares at Edgware Road as well as the H&Cs? They seem
to have managed OK before.

I guessed it must have been the enhanced volume of H&C reversals. Have
they had the entire Hammersmith service reversing at Edgware Road
alongside the District services before?


The Circles are only running as far as Edgware Road this weekend as the
engineering work this weekend is track replacement at Baker Street, rather
than the "usual" CTRL works at Kings Cross.


Aah, that explains it. Thanks.

--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London

Martin Underwood April 9th 06 09:58 AM

District line Wimbleware closure
 
wrote in
:

HSK???? Probably me being thick but I can't identify it.


High Street Kensington?



chunky munky April 9th 06 01:44 PM

District line Wimbleware closure
 
And when the get there... they arrive in platform one, *, and then
reverse via the main line (outer rail) and back into platform two.
Otherwise it would still be possible to have some districts running up
to go round in the middle platforms.

CM

Robin Mayes wrote:
"Colin Rosenstiel" wrote in message
...
In article , (Dave
Arquati) wrote:

The District line is closed from HSK to Edgware Road this weekend (as
it was last weekend), along with the usual SSL closures from Baker St
to Liverpool Street. However, the Circle is still running to Baker
Street from HSK. Is this because they've decided they can't turn
around the Wimblewares at Edgware Road as well as the H&Cs? They seem
to have managed OK before.


I guessed it must have been the enhanced volume of H&C reversals. Have
they had the entire Hammersmith service reversing at Edgware Road
alongside the District services before?


The Circles are only running as far as Edgware Road this weekend as the
engineering work this weekend is track replacement at Baker Street, rather
than the "usual" CTRL works at Kings Cross.




All times are GMT. The time now is 02:16 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk