London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old April 8th 06, 10:45 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,158
Default District line Wimbleware closure

The District line is closed from HSK to Edgware Road this weekend (as it
was last weekend), along with the usual SSL closures from Baker St to
Liverpool Street. However, the Circle is still running to Baker Street
from HSK. Is this because they've decided they can't turn around the
Wimblewares at Edgware Road as well as the H&Cs? They seem to have
managed OK before.


--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London

  #6   Report Post  
Old April 9th 06, 09:58 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jan 2006
Posts: 18
Default District line Wimbleware closure

wrote in
:

HSK???? Probably me being thick but I can't identify it.


High Street Kensington?


  #7   Report Post  
Old April 9th 06, 01:44 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2005
Posts: 19
Default District line Wimbleware closure

And when the get there... they arrive in platform one, *, and then
reverse via the main line (outer rail) and back into platform two.
Otherwise it would still be possible to have some districts running up
to go round in the middle platforms.

CM

Robin Mayes wrote:
"Colin Rosenstiel" wrote in message
...
In article , (Dave
Arquati) wrote:

The District line is closed from HSK to Edgware Road this weekend (as
it was last weekend), along with the usual SSL closures from Baker St
to Liverpool Street. However, the Circle is still running to Baker
Street from HSK. Is this because they've decided they can't turn
around the Wimblewares at Edgware Road as well as the H&Cs? They seem
to have managed OK before.


I guessed it must have been the enhanced volume of H&C reversals. Have
they had the entire Hammersmith service reversing at Edgware Road
alongside the District services before?


The Circles are only running as far as Edgware Road this weekend as the
engineering work this weekend is track replacement at Baker Street, rather
than the "usual" CTRL works at Kings Cross.




Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Heathrow Piccadilly Line Closure Bored Of The Rings London Transport 135 January 5th 05 10:44 AM
Heathrow Piccadilly Line Closure Mait001 London Transport 3 December 18th 04 10:08 PM
Weekend District/Circle Closure Paul Weaver London Transport 24 April 22nd 04 01:02 PM
Five Day closure of Central Line (was surprised) Thomas Covenant London Transport 1 August 18th 03 08:35 AM
Success of Central Line Closure answer to Track Maintenance CJG London Transport 11 August 7th 03 09:11 PM


All times are GMT. The time now is 05:37 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017