Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]() Just thought I would point out that the latest newsletter has gone up on the Barking - Gospel Oak Line User Group website. http://www.barking-gospeloak.org.uk/news.htm in particular I don't think the issues raised have been discussed here. FREQUENCY IMPROVEMENTS & EXTENDED DESTINATIONS: It includes details of a proposed 4 trains an hour Barking to Clapham Junction as well as a double on the frequency on the Stratford to Camden Road section and an extension to Queens Park amongst other quite impressive plans. I have to admit I'll believe it when I see it, but I was present at the talk by Head of Rail Franchising at Transport for London last month, which all this is based on. He was reasonably confident, although admitted there were some practicalities to be sorted. Anyway: target date timetable change is by 2010 (presumably December), so that the operation can be proven to run effectively at least 6 months before the start of the Olympics (all transport has to be proven in advance, to be accepted by the Olympics Committee, or something similar; therefore December 2011 wouldn't allow enough time for any teething problems). OYSTER: Amongst other things, the relationship with Silverlink is such that they plan to have Oyster validators installed at all the NLL stations by the time TfL are running the route. They will be accepting Prepay too. TRAIN STOCK: Not mentioned in the newsletter, but the plan is to have the same rolling stock across the entire East London Line and North London Line (which will all be operated under one contractor - apparently it's not a franchise for some legally minded reason). The only exception to this may be the Goblin line depending on whether wires are installed. The trains will all be a minimum of 4 car in length, I think, which will mean some platforms extensions - some very preliminary work has taken place on this (i.e. TfL chaps going around the NLL network and peering out of the doors at each station to work out any obvious difficulties!). I did note that this would free up a number of 313 units (could Thameslink (FCC) use these, or WAGN (FCC) to bulk up thier Moorgate services)? -- Paul G Typing from Barking |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Charged more to cross London than Aberystwyth to London UPDATE | London Transport | |||
North London Line update | London Transport | |||
East London Line update | London Transport | |||
End of London's Trams Update | London Transport | |||
East London Line Progress Update | London Transport |