Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On 14 Jul 2006 10:09:22 -0700, "Mizter T" wrote:
Paul Corfield wrote: An internal memo just published says the following :- "The Victoria Line upgrade will see a fleet of 47 bigger, state of the art eight car trains introduced into service from 2009 and 2012. As part of the development of the new rolling stock, one of Metronet's contractual obligations [1] is to conduct Customer Acceptance Testing (CAT). (snip) [1] a bit of the contract I was involved in getting written in! I'm glad to hear that someone managed to slip at least one sensible clause into an infraco contract! Perhaps it's time to 'fess up' and tell us what else you and your right thinking colleagues got past the common-sense filter that was installed at 55 Broadway during the PPP negotiations ;-) Oh I don't do confessions about work on here. Last time I got close to doing that I got a load of abuse from some noggin about ticket gates - I'm not going there again. I ended up having to unsubscribe for a while. -- Paul C Admits to working for London Underground! |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Why isn't the 2009 stock walk through like the S stock? | London Transport | |||
2009 stock piss poor interior design | London Transport | |||
2009 stock | London Transport | |||
2009 Stock loading gauge | London Transport | |||
Victoria line 2009 stock customer feedback | London Transport |