Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#9
|
|||
|
|||
reliability of NNL and district line richmond branch
kytelly wrote:
Tom Robinson wrote: On Tue, 25 Jul 2006 23:32:27 +0100, Tom Robinson wrote: On Tue, 25 Jul 2006 19:24:52 +0100, "Aosmosis" wrote: How reliable is the Richmond branch of the NNL and district line? I was waiting at Turnham green for 25 mins for a richmond train. What ever happened to the proposal too run a branch from the central line to Richmond and discontinue the district service? Was it all connected to Crossrail going ahead? Long gone. The proposal was coupled with a Bakerloo branch from Willesden Junction to North Acton to take over the Ealing Broadway branch of the Central line. That rather odd package was an alternative option studied alongside Crossrail some 20 years or so ago as part of a general cross-London rail study. It would have been very expensive for the relatively small achievement of increasing District frequency between Turnham Green and Ealing. -- Dave Arquati Imperial College, SW7 www.alwaystouchout.com - Transport projects in London |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Silverlink / District Line Richmond Ticket validity question | London Transport | |||
Worst line for reliability and best line for reliability? | London Transport | |||
reliability of NNL and district line richmond branch | London Transport | |||
reliability of NNL and district line richmond branch | London Transport | |||
Resignalling the Richmond branch? | London Transport |