Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#3
![]() |
|||
|
|||
![]()
On Sat, 29 Jul 2006 20:14:30 +0100, Tony Polson
wrote: "Boltar" wrote: As I was sitting on the DLR the other day with the train squeeling its way round yet another sharp curve, it suddenly struck me - why did they use standard gauge track? Surely a narrow gauge would be far better suited to the tight curves on the line? Its not as if they'd have had any trouble procuring equipment for narrow gauge since plenty of light rail narrow gauge systems operate in europe. And the DLR is completely self contained with no physical links to any other railway so thats not a concern. Anyone know why they didn't use say metre gauge? Because metre gauge was "not invented here". ... and would also make it difficult for any kind of mixed running on or off the DLR which might occur in the future. -- _______ +---------------------------------------------------+ |\\ //| | Charles Ellson: | | \\ // | +---------------------------------------------------+ | | | // \\ | Alba gu brath |//___\\| |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Loading gauge question | London Transport | |||
CTRL loading gauge | London Transport | |||
Track Charts or Track maps of the London Underground | London Transport | |||
Loading gauge | London Transport | |||
LUL track gauge not the same as BR gauge? | London Transport |