Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#17
|
|||
|
|||
Orbirail mess (was Planned upgrade for rail routes (aka Outer Circle Line, London))
In article , Dave Arquati
writes Could it be to let them get experience with the effects of pathing the ELL on to the NLL, before it opens? That's what I thought, but it doesn't seem to work - it must either run to Dalston Kingsland or Dalston Junction; if it's the former, then wouldn't they need to build expensive and temporary turnback facilities? If it's the latter, then there seems to be little point running a precursor when the proper ELL could be run through. Not if they build the junction, with temporary buffer stops on the ELL route, early, well before finishing the rest of the ELL stuff (in particular, the link from Whitechapel to the viaduct). -- Clive D.W. Feather | Home: Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org Fax: +44 870 051 9937 | Work: Please reply to the Reply-To address, which is: |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Travel costs hitting the low paid in outer London (zones 4 to 6) | London Transport | |||
Heathrow T5 Pods (aka 'ULTra PRT') begin three week "confidence trials". | London Transport | |||
Final design for the "New Bus for London" (aka BorisBus / newRoutemaster) unveiled | London Transport | |||
Central line outer reaches | London Transport | |||
The truth about the LibDems aka FibDems | London Transport |