London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old August 5th 03, 06:26 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 106
Default Success of Central Line Closure answer to Track Maintenance


"CJG" wrote in message
...
In message , Clive D. W. Feather
writes
Result: 2.5 hours work for 4.5 hours effort and probably a full day's
pay at night rate


So that would be a "Yes. They are ripped off by their contractors"


No, that'd be "The contractor put a bid in for the work, along with others.
Usually, the cheapest bid wins".


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Your path to success !!! kavithanalan London Transport 0 April 23rd 08 07:06 AM
Track Charts or Track maps of the London Underground [email protected] London Transport 5 December 16th 06 01:30 AM
Find a name get the answer Anon London Transport 15 January 19th 04 06:43 PM
South Central maintenance depot in Bedford! Clive Page London Transport 10 December 22nd 03 01:50 PM
Fleet Maintenance Pro v9.0.19 Enterprise 100 users, STRACfastMaintenance 2.5c, Auto Maintenance Pro v9.0 Professional Incl Keygen,various other AUTO and BOAT Maintenance progs ... [email protected], [email protected] London Transport 0 October 23rd 03 04:03 PM


All times are GMT. The time now is 08:31 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017