London Banter

London Banter (https://www.londonbanter.co.uk/forum.php)
-   London Transport (https://www.londonbanter.co.uk/london-transport/)
-   -   Thameslink 2000 Power (https://www.londonbanter.co.uk/london-transport/5051-thameslink-2000-power.html)

Paul Scott March 9th 07 06:26 PM

Thameslink 2000 Power
 

"asdf" wrote in message
...
On Wed, 7 Mar 2007 12:20:15 -0000, John Rowland wrote:

I am not sure
why Blackfriars was ever considered as the changeover point, especially
since catenary would increase the visual intrusion of the bridge over the
Thames.


Perhaps because trains don't normally stop at City Thameslink on
Sundays, Saturday evenings, and during the night. If the changeover is
there, they'll all have to stop there all the time.


Hasn't it now been established that modern units can changeover on the move,
especially from AC to DC? The 377s on the WLL definitely can, in both
directions.

Paul




All times are GMT. The time now is 07:04 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk