London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old March 9th 07, 12:35 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default Tramlink needs Bustitution to meet capacity requirements - crazy

On 9 Mar, 11:58, Tom Anderson wrote:
On Fri, 9 Mar 2007, Bob wrote:
'I can't think of any PFI project we have inherited that wasn't
dysfunctional in one way or another." So said Ken Livingstone, in
typically forthright fashion.


So who negotiated the contract in the first place?


Presumably it was London Regional Transport (LRT), which was then an
organisation controlled more or less directly by central government,
specifically by the Department of Transport. The contract was signed
between Tramtrack Croydon Ltd and London Bus Services Ltd - which was,
and still is, the legal entity that organises bus services in London
(at the time it was part of LRT, but when the GLA was set up it became
a subsidiary of Transport for London).

I don't know exactly what role all the different bodies played in
this, but as the money was coming from central government they
certainly dictated the broad terms of this PFI contract. Who exactly
is to blame for the detail, i.e. the inadequacies of the Tramlink
contract, I'm not so sure. In a way it doesn't much matter now, at
least with regards to the specific issues that Tramlink has, in a way


Any chance this is going to put Ken off commissionairing the London
Overground?


No. The deal is done. AIUI the DfT agreed to let TfL control the
London Overground (LO) on the condition that it was operated as a
concession by a private sector company, so TfL would not have been
able to directly run it themselves and directly employ all the workers
(though I could be wrong on that).

The LO concession will however be handled by TfL themselves through
the TfL Rail division. TfL Rail are also responsible for the DLR,
which is run by a private company, Serco Docklands Ltd, and TfL find
this a very satisfactory arrangement. So I'd suggest that TfL will
very carefully specify the contract for the LO concession, and will
have a good relationship with the operator.

  #2   Report Post  
Old March 9th 07, 12:59 PM posted to uk.transport.london
Bob Bob is offline
external usenet poster
 
First recorded activity at LondonBanter: Nov 2005
Posts: 114
Default Tramlink needs Bustitution to meet capacity requirements - crazy

On Mar 9, 1:35 pm, "Mizter T" wrote:
On 9 Mar, 11:58, Tom Anderson wrote:

On Fri, 9 Mar 2007, Bob wrote:
'I can't think of any PFI project we have inherited that wasn't
dysfunctional in one way or another." So said Ken Livingstone, in
typically forthright fashion.


So who negotiated the contract in the first place?


From the TfL website:

Tramtrack Croydon Ltd won a 99-year Private Finance Initiative (PFI)
concession to design, build and maintain the Croydon Tramlink System
in 1996
Croydon Tramlink was opened in May 2000
Croydon Tramlink carries around 24 million passengers a year
TfL inherited responsibility for the PFI contract with Tramtrack
Croydon Ltd following TfL's creation in 2000.

Remember that Ken was in the outer darkness at the time and had the
Tube PPP foisted upon by the Treasury - presumably the same thing
happened in Croydon.

  #3   Report Post  
Old March 9th 07, 01:16 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default Tramlink needs Bustitution to meet capacity requirements - crazy

On 9 Mar, 13:59, "Bob" wrote:
On Mar 9, 1:35 pm, "Mizter T" wrote: On 9 Mar, 11:58, Tom Anderson wrote:

On Fri, 9 Mar 2007, Bob wrote:
'I can't think of any PFI project we have inherited that wasn't
dysfunctional in one way or another." So said Ken Livingstone, in
typically forthright fashion.


So who negotiated the contract in the first place?


From the TfL website:


Tramtrack Croydon Ltd won a 99-year Private Finance Initiative (PFI)
concession to design, build and maintain the Croydon Tramlink System
in 1996
Croydon Tramlink was opened in May 2000
Croydon Tramlink carries around 24 million passengers a year
TfL inherited responsibility for the PFI contract with Tramtrack
Croydon Ltd following TfL's creation in 2000.

Remember that Ken was in the outer darkness at the time and had the
Tube PPP foisted upon by the Treasury - presumably the same thing
happened in Croydon.


Sort of the same thing - though the Underground PPP was an
'innovation' of the new Labour government elected in 1997, whilst the
Tramlink PFI deal was done under the previous Tory government.

  #4   Report Post  
Old March 9th 07, 06:23 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 3,995
Default Tramlink needs Bustitution to meet capacity requirements - crazy

On 9 Mar 2007 06:16:51 -0800, "Mizter T" wrote:

On 9 Mar, 13:59, "Bob" wrote:
On Mar 9, 1:35 pm, "Mizter T" wrote: On 9 Mar, 11:58, Tom Anderson wrote:

On Fri, 9 Mar 2007, Bob wrote:
'I can't think of any PFI project we have inherited that wasn't
dysfunctional in one way or another." So said Ken Livingstone, in
typically forthright fashion.


So who negotiated the contract in the first place?


From the TfL website:


Tramtrack Croydon Ltd won a 99-year Private Finance Initiative (PFI)
concession to design, build and maintain the Croydon Tramlink System
in 1996
Croydon Tramlink was opened in May 2000
Croydon Tramlink carries around 24 million passengers a year
TfL inherited responsibility for the PFI contract with Tramtrack
Croydon Ltd following TfL's creation in 2000.

Remember that Ken was in the outer darkness at the time and had the
Tube PPP foisted upon by the Treasury - presumably the same thing
happened in Croydon.


Sort of the same thing - though the Underground PPP was an
'innovation' of the new Labour government elected in 1997, whilst the
Tramlink PFI deal was done under the previous Tory government.


Not really the same thing at all. The PPP is a long maintenance and
upgrade contract - the operation remains in the public sector as do the
assets. The PPP Contractors take no revenue related risk as they do not
have access to the farebox revenue and no incentive to directly increase
such revenue. Indirectly they have an influence in that a better
performing railway should attract custom and delivery of the line
upgrades will grow revenue as a result of better train services and more
capacity. They, for example, do not have an immediate obligation to make
stations much bigger if ridership increases. This is almost an
impossible risk to pass to the private sector as growth trends are
hugely variable and the associated expenditure to make stations much
bigger is in the tens or hundreds of millions of pounds.

Under Tramlink design, build, maintain and operate is all in the private
sector and I believe the assets belong to Tramtrack Croydon too. These
would revert to the public sector upon termination or expiry of the
contract. I suspect the row about Tramlink centres on several things -
revenue assumptions given that TfL have radically changed the fares
structure assumed for Tramlink, maintenance and upgrade responsibilities
- the system will very soon need some major work doing to it to keep it
fit and the upgrade risk resulting from passenger growth.

Given the Tramlink deal is for 99 years it is pretty important to get
these "fault lines" in the contract sorted out. If it is not resolved
quickly then you will end up with a system that is simply falling to
bits because the respective parties will walk away from their real /
imagined obligations to maintain and grow the system. Given the
argument that was in the article I think TfL are on pretty weak ground
and will end up coughing up the money. I suspect their quid pro quo
will be much greater direct control over the operation as per the DLR
set up. There will almost certainly be a renegotiation or else a large
scale variation to the contract - I doubt the parties are genuinely at
the "tear it up and walk away" stage.

The other very interesting factor that is not yet obvious is how will
the system be extended. If we look at the Metrolink precedent each time
the concession has been relet and each time the operating consortium has
changed. Quite what compensation has flowed between the parties in the
background I do not know but if Tramlink does extend to Crystal Palace
(or wherever) it will be interesting to see how TfL decide to play the
procurement game.


--
Paul C


Admits to working for London Underground!



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
That Crazy 88 Bus Offramp London Transport 2 May 16th 12 06:39 PM
Rail replacement bus requirements? Tim Roll-Pickering London Transport 7 January 2nd 12 10:46 AM
Ex- Underground Carriages to meet capacity requirements? Neil Williams London Transport 1 September 30th 10 01:23 PM
Bustitution around Liverpool Street over christmas Tom Anderson London Transport 20 December 12th 07 06:16 PM
Emergency services gone crazy Phil Lepherd London Transport 37 July 23rd 05 09:10 AM


All times are GMT. The time now is 06:50 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017